Indiana District Approves $80M for Two Construction Projects

The Tippecanoe School Corporation in Lafayette, Ind., recently approved $80 million in bids for two district construction projects. The first is the construction of a new facility for Klondike Middle School, with comes with an estimated cost of $69 million from Kettelhut Construction. The second is an expansion project at Mayflower Mill Elementary School, according to local news.

The district plans to redistribute students among different facilities once construction is complete. The elementary school will serve students in grades K–2; students in grades 3–5, currently attending the elementary school, will move into the existing middle school building to be renamed Klondike Intermediate School; and students in grades 6–8 will move into the new Klondike Middle School building.

TSC Superintendent Dr. Scott Hanback said that the existing middle school was built during the 1970s and underwent renovations in the 1990s. The new Klondike Middle School building was originally approved in March and is set for completion by fall 2024.

The existing elementary school, meanwhile, was built in the 1950s and has seen numerous additions since then. The current expansion project is a result of rising population in the area.

“They’re exploding in population, and they need more classroom space,” said Brian DeFreese, TSC Board President. “So, we approved all the funding to add more classrooms; bigger spaces; and new, more modern spaces. So, it’s an expansion. There are two phases; we’ve approved the first phase. There’s a second phase to it that adds even more to the interior, and then we wanted to make a more secure entrance to the school, and that’ll be in the second phase.”

The elementary school expansion was originally budgeted at $15 million, but the board received a $10 million bid from the J. R. Kelly Company. Construction on both facilities will proceed while students are out of school for the summer, and the elementary school project has an estimated completion date of fall 2023.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

  • Abstract tech network data connections with orange, blue glowing dots, lines

    3 Trends for Higher Education to Stay Ahead of in 2026

    As universities enter the new year, the question is no longer whether digital transformation is necessary, but how quickly institutions can convert technological potential into strategic advantage.

Digital Edition