Texas District Breaks Ground on K–8 Tech Campus

The Manor Independent School District in Manor, Texas, recently broke ground on a new, technology-focused campus that will serve students in grades K–8. The future facility will measure in at two stories and 116,000 square feet, and it will have a capacity of about 800 students.

Amenities are set to include a large media center, two art rooms, three maker spaces, two gymnasiums, a performing arts classroom, and student collaboration areas and flex space, according to a news release.

“Not only is this a momentous occasion for Manor ISD because it marks the first step in building a new, state-of-the-art facility for our district’s scholars, but it is groundbreaking because it will be the first campus of its kind in our region,” said Manor ISD Superintendent Dr. Andre D. Spencer. “This campus will serve K–8 students under one roof, which is a rare educational model in the public school system in our state. We are excited about the many proven benefits of this model, including lower levels of anxiety among middle schoolers.”

Funds for the project come from a $280-million bond package that local voters approved in November 2019. The package focused on projects that would accommodate student growth; upgrade and repair existing facilities; and improve transportation, technology and security. Enrollment projections predict that the district is set to grow by 2.5 to 5 percent per year for the next ten years.

The district is partnering with HPM as program manager in charge of project management, quality control and preconstruction services. It’s also partnered with architecture firm ADM Group, Inc. and construction manager at risk Lee Lewis Construction Inc.

“HPM is proud to lead Manor ISD and our project partners through the development of this exciting project,” said HPM Senior Program Manager Andrew Betts. “This campus will provide a unique opportunity to incorporate technology and interactive learning within nine levels of education, all on one campus. This ceremony is a symbol of Manor ISD’s commitment to providing the best educational resources for the scholars within this community.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

Digital Edition