Chapman University Debuts New Hall of Engineering

Chapman University in Orange, Calif., recently opened a new home for its engineering school. The Swenson Family Hall of Engineering was created through a 31,000-square-foot interior build-out of the university’s existing Keck Center for Science and Engineering. The new wing occupies three floors and features amenities like research and teaching labs, a makerspace and robotics lab, and more. Both the Swenson Family Hall of Engineering and the Keck Center were built by C.W. Driver Companies.

“We were honored to partner with Chapman University in constructing a both beautiful and highly functional hall for its newest academic program, the Fowler School of Engineering,” said Aimee Siemianowski, project executive with C.W. Driver Companies. “Our long history of constructing higher education and research facilities for Chapman University and colleges across the state enabled us to deliver a cutting-edge facility designed to foster collaboration, reconfiguration and blur the lines between teaching and education.”

Swenson Family Hall of Engineering
Photo credit: Lawrence Anderson

The new wing’s first level serves as a collaborative student space and features a large gallery that connects to the rest of the Keck Center. The second floor includes research pods, teaching labs and study alcoves, while the third features a faculty suite that includes workspaces, meeting space and collaboration zones. The facility is named after Jim Swenson and the Swenson Family Foundation, which previously contributed $5 million to Chapman University.

“The opening of the Keck Center’s science wing in 2018 signaled a tremendous step forward in the STEM fields at Chapman University,” said Collette Creppell, vice president of campus planning and design at Chapman University. “Thanks to the valuable expertise of C.W. Driver Companies in building the Swenson Family Hall of Engineering, our new Fowler School of Engineering has a place to call its own. The facility will be paramount to attracting high-quality faculty and talented students pursuing undergraduate and graduate-level study of engineering, which in turn will help meet the growing demands of the California economy.”

The university and C.W. Driver Companies also partnered with AC Martin Partners, Inc. for the facility’s design.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • sapling sprouting from a cracked stone

    Lessons in Resilience: Disaster Recovery in Our Schools

    Facility managers play a pivotal role in how well a school weathers and recovers from a crisis. Whether it's a hurricane, a flood, a tornado, or a man-made event, preparation determines resilience.

  • classroom with crystal ball on top of a desk

    Call for Opinions: Spaces4Learning 2026 Predictions for Educational Facilities

    As 2025 winds to a close, the Spaces4Learning staff is asking its readers—school administrators, architects, engineers, facilities managers, builders, superintendents, designers, vendors, and more—to send us their predictions for educational facilities in 2026.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

Digital Edition