Alabama Elementary School Breaks Ground on Replacement Facility

Hartselle City Schools in Hartselle, Ala., recently broke ground on a replacement facility for the oldest school in its district. The new Crestline Elementary School will cover about 105,000 square feet, cost about $36 million, and is scheduled for completion in time for the beginning of the 2024–25 school year, according to local news.

The new building will have a capacity of more than 1,000 students in grades PreK–4. The primary purpose of construction was to relieve overcrowding at the existing school; local news reports that the district has grown by more than 500 students over the last ten years. School district leaders said they expect the trend to continue as new neighborhoods with hundreds of homes continue their development.

Amenities in the new elementary school will include 65 classrooms, a separate drop-off line for PreK and special needs students, a special-needs wing featuring a sensory room, gifted education classrooms, and an expanded robotics lab.

Part of the existing Crestline Elementary building will be demolished, and part of it will remain standing as additional classroom space for the district as needed, local news reports.

“Crestline has served our school system, our students, and our community well since its original construction in the 1950s,” said school board member Daxton Maze. “As education needs change and as Hartselle continues to grow, the expanded footprint of the new school will allow us to serve our rising student population in an environment that is conducive to high-quality instruction. The scholastic expectation in Hartselle is excellence, and the new Crestline School will be a visual representation of the community’s desire to provide the best education possible for our kids.”

The school district is partnering with Davis Architects for the building’s design and with Bailey-Harris Construction Co. for the building’s construction.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • DLR Group Appoints New K–12 Education Practice Leader

    Integrated design firm DLR Group recently announced that it has named its new global K–12 Education leader, Senior Principal Carmen Wyckoff, AIA, LEED AP, according to a news release. Her teams have members in all 36 of the firm’s offices in the U.S., Puerto Rico, the U.S. Virgin Islands, Europe, and Asia.

  • New eBook Shares Guidelines on Building CTE Centers

    Career and Technical Education (CTE) curriculum and resources provider iCEV recently announced the publication of a new eBook sharing guidance and insights on building new CTE facilities, according to a news release.

  • Delta State University Completes Renovations to School of Nursing Facilities

    Delta State University recently completed a major expansion and renovation project for the Robert E. Smith School of Nursing facilities on its campus in Cleveland, Miss., according to a news release. The project includes about 14,000 square feet of new construction and more than 21,000 square feet of renovation work to the existing space.

  • University of West Florida Opens New Laboratory Facility

    The University of West Florida recently announced that renovation work is complete on a new lab building for its campus in Pensacola, Fla., according to university news. Building 80 will serve as the home to the university’s civil engineering program and the Tyler Chase Norwood Construction Management Program.

Digital Edition