University of Tampa Begins Construction on 10-Story Multipurpose Building

The University of Tampa in Tampa, Fla., recently announced that construction has begun on a new, 10-story Multipurpose Building, according to a news release.

The 460,000-square-foot space will include a residence hall with 600 beds; 37 faculty offices; five classrooms; a designated study lounge for veterans as well as other study spaces; a Starbucks; spaces for the Office of Diversity, Equity and Inclusion, the Institute for Sales Excellence and the International Programs Office; and parking for 440 vehicles.

The university partnered with KWJ Architects as the designer and Baker Barrios as the executive architect. The space is scheduled for completion in 2024. Once the Multipurpose Building opens, it will hold the distinction of the largest building on the university’s campus.

University of Tampa Multipurpose Building
Baker Barrios Architects announces the start of construction on the new 10-story Multipurpose Building at The University of Tampa. The 460,000-square-foot, mixed-use building will be the largest on campus when completed in 2024. Baker Barrios is serving as executive architect on the project.

“With over 110 acres of buildings and landscaped grounds, the campus itself provided a great deal of the architectural inspiration for this project; however, the design was equally influenced by the intended users, today and into the future,” said Grayson Silver, AIA, managing partner at Baker Barrios. “The students and educators who will live, learn and gather in this building will be inspired by the values that shaped the design: community, diversity, reflection, engagement and a true sense of home.”

The building’s design features red brick, precast concrete, metal, and glass, which will merge the campus’ historic buildings with more modern additions. The secured residence hall floors will also give students access to a 9,000-square-foot “sky park” including active and passive zones to boost the student living experience, the news release reports.

“Each new addition to our campus signifies the university’s commitment to nurturing student development,” said University of Tampa President Ron Vaughn. “We value spaces that encourage students and faculty to gather and collaborate, which aligns with Baker Barrios’ philosophy of ‘people first’ and is evident in the design of this new building.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

  • iPark 87

    Building a Future-Focused Career and Technical Education Center

    A district superintendent shares his team's journey to aligning student passions with workforce demands, and why their new CTE center could be a model for districts nationwide.

Digital Edition