Missouri University Selects Builder for Protoplex Building

Missouri University of Science and Technology in Rolla, Mo., recently announced that it has selected the construction manager at risk for its upcoming Protoplex building. PARIC Corp. will spearhead the new facility that will become the anchor of the university’s Manufacturing Technology and Innovation Campus. The Protoplex building comes with an estimated price tag of $53.4 million and will cover 116,000 square feet, according to local news.

A news release reports that the facility will connect federal, state, and industry agencies alongside colleges and universities throughout the state. “The Missouri Protoplex will be the headquarters for a state-wide ecosystem where experts, innovators, small and large businesses, entrepreneurs, educators, and policy-makers develop and adopt the technologies needed to create and sustain manufacturing jobs throughout the state,” according to the press release.

The space is set to include labs and shop spaces, high-bay and double-height labs, meeting and collaboration spaces, storage, administrative space, display spaces, and a lobby area. The university is also partnering with Mackey Mitchell Architects, Perkins&Will Architects, and McClure Engineering. Construction is scheduled to start during summer 2023.

According to the university website, the facility is designed around the manufacturing industry’s four fundamental disciplines: materials, manufacturing & methods; pre-production testing & development; the forge-steel and advanced metallurgy; and cyber-physical systems security, testing & development. The Protoplex building will offer space and equipment across its offices, labs, and research and production facilities for each facet.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • California School District Starts Construction on Public Safety Center

    The San Bernardino City Unified School District (SBCUSD) recently announced that construction has begun on a new public safety center that will house the district’s safety and security programs. According to a news release, the James Ramos Center for Public Safety will measure in at 17,140 square feet and contain the district’s Police Department, Office of Emergency Management, and cadet program.

  • Extron, CENTEGIX Partner for Comprehensive School Security Solution

    Professional audiovisual solutions provider Extron recently announced a partnership with CENTEGIX, which provides rapid incident response technology, to integrate two of their top products in the name of school safety.

  • Fellowes Launches New 3D Modular, Product Configurators

    Contract interiors and architectural solutions provider Fellowes recently announced the launch of new 3D modular and product configurators for several of its product lines, according to a news release. The new products offer SIF file integration and pricing for the Volo, Markerboards, Sena, and Rising product lines in connection with 3D Cloud, which provides 3D product visualization and 3D digital asset management.

  • California High School Starts Construction on STEAM, Music Buildings

    Tamalpais High School, part of the Tamalpais Union High School District, recently broke ground on two new major facilities for its campus in Mill Valley, Calif., according to a news release. The district is partnering with Quattrocchi Kwok Architects (QKA) and Lathrop Construction Associates for the Science Technology, Engineering, Arts, and Mathematics (STEAM) and Music Buildings, both replacing their outdated counterparts.

Digital Edition