Missouri University Selects Builder for Protoplex Building

Missouri University of Science and Technology in Rolla, Mo., recently announced that it has selected the construction manager at risk for its upcoming Protoplex building. PARIC Corp. will spearhead the new facility that will become the anchor of the university’s Manufacturing Technology and Innovation Campus. The Protoplex building comes with an estimated price tag of $53.4 million and will cover 116,000 square feet, according to local news.

A news release reports that the facility will connect federal, state, and industry agencies alongside colleges and universities throughout the state. “The Missouri Protoplex will be the headquarters for a state-wide ecosystem where experts, innovators, small and large businesses, entrepreneurs, educators, and policy-makers develop and adopt the technologies needed to create and sustain manufacturing jobs throughout the state,” according to the press release.

The space is set to include labs and shop spaces, high-bay and double-height labs, meeting and collaboration spaces, storage, administrative space, display spaces, and a lobby area. The university is also partnering with Mackey Mitchell Architects, Perkins&Will Architects, and McClure Engineering. Construction is scheduled to start during summer 2023.

According to the university website, the facility is designed around the manufacturing industry’s four fundamental disciplines: materials, manufacturing & methods; pre-production testing & development; the forge-steel and advanced metallurgy; and cyber-physical systems security, testing & development. The Protoplex building will offer space and equipment across its offices, labs, and research and production facilities for each facet.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • AP Construction Breaks Ground on Two Projects for Austin ISD

    Adolfson & Peterson Construction (AP) recently announced that it has broken ground on two renovation projects for the Austin Independent School District, according to a news release. The work at McCallum and Anderson High Schools totals 97,350 square feet and is scheduled for completion in January 2027.

  • S4L Launches 2025 Facilities and Construction Brief Survey

    Spaces4Learning recently launched its 2025 Facilities and Construction Brief Survey, which gathers information on K–12 and higher education construction projects nationwide from the previous year. The data we get from you, our readers, forms an industry report offering an overview of current trends in school facilities.

  • Georgia High School Debuts 500-Seat Esports Arena

    Cass High School in Bartow County, Ga., recently announced the opening of a new, 7,000-square-foot Esports Arena, according to a news release. The Bartow County School System partnered with Extron AV Technology on the project.

  • Kenall Introduces Millenium Flair Series

    In a move aimed at modernizing institutional lighting without compromising on durability or performance, Kenall has launched its new Millenium Flair series, according to the Kenall website.

Digital Edition