Kraus-Anderson Finishes $21.4M, Two-School Renovation Project

Kraus-Anderson in Duluth, Minn., recently announced that it has completed a $21.43-million addition and remodel of two facilities for Ely Public Schools in Ely, Minn. The district consists of Ely Memorial High School and Washington Elementary School, which serve a combined total of about 550 students, according to a news release. The project involved 110,500 square feet of renovation work total, including a 71,000-square-foot remodel of the two schools, according to a news release.

“The project added a new 39,000-square-foot commons area that creates a connection link between the high school and the elementary school,” said Todd Erickson, senior project manager at Kraus-Anderson. “The area also contains a safe and secure entry system, school district offices, and high-school and elementary offices.”

Ely Public Schools Renovation Addition
Image courtesy of Shore to Shore Communications, Inc.

The new space includes CTE classrooms, a media center, gymnasium, music room, metals shop and wood shop, and a new cafeteria with upgraded kitchen equipment, the news release reports. The high school gained new boys’ and girls’ locker rooms, the elementary school a new Early Family Childhood Education (ECFE) area, and both received new HVAC systems.

Construction started in May 2021, and the school district also partnered with Architectural Resources, Inc., for the design.

“In addition to budget, staffing, and supply-chain challenges brought about by COVID-19, crews discovered 1,700 cubic yards of ledge rock, which had to be blasted and excavated to allow installation of new utilities,” Erickson said.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

Digital Edition