New Hampshire High School Announces $21M Social Studies Wing

Pinkerton Academy High School in Derry, N.H., recently announced plans to build a $21-million replacement social studies wing, according to a news release. The existing structure was built in the 1970s as a temporary space and no longer meets the needs of the growing student population or the academic programs housed there.

According to a presentation on the school’s website, the new wing will cover 30,275 square feet and stand three stories tall. The first floor will house the ACT office and nurse station, as well as five classrooms and 10 specialized spaces. The second floor will house seven classrooms and five specialized spaces, including student breakout rooms and a teachers’ room. The third floor will house eight classrooms and administrative space.

“The design of the building and location is done in a cost-effective way to not only meet NEASC accreditation requirements, but also and most importantly, meet the current and future needs of the programs that it will house—while also having the flexibility for expansion in the future, should the need arise,” according to the school’s website.

The school is partnering on the project with Eckman Construction. Demolition of the current space and construction is scheduled to begin this summer, with an estimated completion date of December 2024.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Armstrong World Industries Acquires Geometrik

    Armstrong World Industries, designer and manufacturer of interior and exterior architectural applications like ceilings, walls, and metal solutions, recently announced its acquisition of Canada-based Geometrik, according to a news release. The British Columbian Geometrik specializes in designing and manufacturing wood acoustical and wall systems.

  • North Dakota State University Completes Music School Renovation

    North Dakota State University in Fargo, N.D., recently announced that construction on the Challey School of Music has finished, according to a news release. The university partnered with Foss Architecture & Interiors for design and Kraus-Anderson for construction services, and construction began in July 2024.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

  • South Texas K–12 District Debuts Region’s First Electric Bus Fleet

    The Valley View Independent School District in Pharr, Texas, recently announced a partnership with Highland Electric Fleets to launch the district’s—and the region’s—first fleet of all-electric school buses, according to a news release.

Digital Edition