Pomfret School Adds Metinteractive AV Technology into Auditorium Renovations

Pomfret School, a college preparatory boarding and day school that serves students in grades 9–12 in Pomfret, Conn., recently completed renovations to one of its two auditoriums on campus, according to a news release. The Hard Auditorium was originally built in 1928 and plays home to school gatherings and theater performances. Recent renovations turned the 280-seat theater into a multipurpose space that can seat up to 430 for assemblies, 330 for drama or dance performances, or a flat-floor event space, the news release said.

Renovations included the installation of new AV systems to provide sound and video in the space. The school partnered with Centerbrook Architects and Planners and AV consultant Acentech to install AV technology by design and systems integration firm Metinteractive.

“This was a very significant and complex renovation, virtually down to the wood structure of the building and integrating new infrastructure,” said Metinteractive CEO Jeff Mele. “Many late-stage changes impacted our work, requiring us to continually change our strategy for completing the project.”

According to the news release, “Fulcrum CX1295 loudspeakers comprise the center clusters with CX896 speakers as side fills, a CS121 subwoofer, QSC’s Q-SYS audio, video and control platform plus a Behringer X32 digital mixing console in the FOH booth.  Fulcrum FX1295 moveable floor monitors are deployed when the space takes on a new configuration for live music events.  A ClearCom analog intercom system links dressing rooms and instrumental rehearsal rooms downstairs to the sound booth; ceiling-mounted JBL speakers in those spaces take the stage audio feed.”

Other new AV technology in the Hard Auditorium includes a projection screen and projector, as well as a PTZ camera to film the stage and a 55-inch NEC display in the dressing rooms and rehearsal rooms. Touch panels for audio and video were installed on the stage and in the sound booth.

“Working with Metinteractive was really wonderful from the project’s conception to troubleshooting any issues that came up through a great installation process,” said Mackenzie Christensen, who handles the auditorium’s live event audio and video production. “Jesse LaBranche and the Metinteractive team have been incredibly responsive and have worked tirelessly to make it all happen. It makes me feel comfortable knowing they are on our side should we encounter any hiccups.”

The school also partnered with Shawmut Design and Construction for construction management.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Image courtesy of Armstrong International

    The Modern Hot Water System Approach to Keep Higher Education Buildings Safe and Operational

    Higher education campuses face unique structural and operational demands. With a range of old and new buildings, a variety of facility types, and ambitious sustainability goals, it's essential that no aspect of infrastructural performance is overlooked. Facility managers must be equipped to provide a safe, reliable and efficient space for students, faculty and guests.

  • Texas K–12 District to Build New Elementary, High Schools

    The High Island Independent School District on the Bolivar Peninsula in Southeast Texas recently announced that construction on a new elementary school and a new high school will begin in January 2026, according to local news. Funding will come from a $27.9-million bond passed in May 2025.

  • Austin International School Library Renovation

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Austin International School has been recognized with an EDS 2025 Grand Prize award in the category of Renovation.

  • Allegion US Partners with Two Colleges for Mobile Credential Technology

    Allegion US recently announced a partnership with Florida Institute of Technology (FIT) and Denison College, in conjunction with Transact + CBORD, to install mobile credential technologies campus-wide, according to a news release. Implementing Mobile Student ID into Apple Wallet and Google Wallet will allow students access to campus facilities, amenities, and residence halls using just their phones.

Digital Edition