C.W. Driver Completes $52.5M K–8 School in California

Builder C.W. Driver Companies recently announced that it has completed construction on a $52.5-million K–8 campus in Irvine, Calif. The new Solis Park School campus measures in at 108,000 square feet and is currently welcoming students in grades K–5, according to a news release.

The seven-building campus features amenities like a child-care facility and commissary, as well as educational environments and features “designed to foster discovery, curiosity, collaboration, and innovation,” the news release reports. Other amenities include an innovation lab for engineering, video production, and robotics; a design lab; dedicated science and music classrooms; dedicated space for special education; and multiple outdoor learning spaces. Physical education classes will take place in a fitness center and an indoor gym.

“We have a strong passion for building schools at C.W. Driver knowing that our work will provide children a safe and modern place to learn for many years to come,” said C.W. Driver Companies project executive Tom Jones. “The Irvine USD schools are absolutely beautiful; it’s with great pride we were included in their program.”

The news release also reports that the school was designed to meet CHPS (Collaborative for High-Performance Schools) criteria. CHPS’ goal is to increase student well-being and performance via facilities that are energy-efficient, healthy, and that subscribe to modern learning pedagogies.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

  • Abstract tech network data connections with orange, blue glowing dots, lines

    3 Trends for Higher Education to Stay Ahead of in 2026

    As universities enter the new year, the question is no longer whether digital transformation is necessary, but how quickly institutions can convert technological potential into strategic advantage.

Digital Edition