Leander ISD Breaks Ground on New Elementary School

The Leander Independent School District near Austin, Texas, recently held a groundbreaking ceremony for a new elementary school, according to a district news release. Currently known as Elementary School 30, the new school is being built to accommodate a rapidly growing student population and will have the capacity for 800 students, local news reports.

The project is being funded through savings from 2017 and 2007 bonds, the news release reports. “As #1LISD continues to grow, I’m grateful to celebrate the construction of Elementary School 30 out of bond savings,” said district superintendent Bruce Gearing. “We are fortunate to be able to provide facilities for our incredible students and staff with input and support from our community.”

The district is partnering with Pfluger Architects for the project’s design and American Constructors for its construction. The new facility is set to open its doors to students in time for the 2024–25 school year. Local news also reports that the naming process for the new school is in progress.

School Board President Trish Bode called the project a “long time coming” and said, “When [ES No. 30] opens, it [will be a] building for our teachers and for our students to get together, so I’m thinking we’re going to experience more excitement in learning going on. That means a lot to our community, to have a building and not portables.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

  • Abstract tech network data connections with orange, blue glowing dots, lines

    3 Trends for Higher Education to Stay Ahead of in 2026

    As universities enter the new year, the question is no longer whether digital transformation is necessary, but how quickly institutions can convert technological potential into strategic advantage.

Digital Edition