Houston-Area K–12 District Breaks Ground on New CTE Center

The Brazosport Independent School District in Freeport, Texas, recently held a groundbreaking ceremony for a new Career and Technical Education (CTE) Center at Brazosport High School, according to a news release. The 76,000-square-foot facility is being funded through a 2019 bond and has an estimated completion date of December 2024. The district partnered with VLK Architects for the building’s design.

“VLK is very fortunate to have partnered with Brazosport ISD in the design of the Brazosport High School CTE Center,” said VLK Architects Principal Monika Castillo. “The new building and addition will allow the district to continue delivering instruction for the betterment of their students’ futures.”

The new building will connect directly to the main school and offer specialized spaces for programs including cosmetology, floral design, veterinary technology, journalism, and others. It will also feature workshops for welding, architectural engineering, and construction, each with a dedicated classroom space and shop area with access to an outdoor, secured workspace. The new spaces were designed to include natural light and exterior finishes that complement the rest of campus.

The news release reports that the cosmetology lab will include installations for hair styling, pedicures and manicures, and facial treatments, while the vet tech lab will have space for animal treatment and grooming. The facility will also include a podcast room, green screen room, and control room for the school’s AV and multimedia production programs.

“Our new Career and Technical Education building will serve as a hub of innovation, fostering creativity, collaboration, and hands-on learning,” said Brazosport ISD Superintendent Danny Massey. “This facility will provide our students with access to cutting-edge technology, modern workshops, and industry-standard equipment across a wide range of disciplines. Together, we will build not only a physical structure for our students today, but also a legacy of excellence for generations to come.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • sapling sprouting from a cracked stone

    Lessons in Resilience: Disaster Recovery in Our Schools

    Facility managers play a pivotal role in how well a school weathers and recovers from a crisis. Whether it's a hurricane, a flood, a tornado, or a man-made event, preparation determines resilience.

  • classroom with crystal ball on top of a desk

    Call for Opinions: Spaces4Learning 2026 Predictions for Educational Facilities

    As 2025 winds to a close, the Spaces4Learning staff is asking its readers—school administrators, architects, engineers, facilities managers, builders, superintendents, designers, vendors, and more—to send us their predictions for educational facilities in 2026.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

Digital Edition