Houston-Area K–12 District Breaks Ground on New CTE Center

The Brazosport Independent School District in Freeport, Texas, recently held a groundbreaking ceremony for a new Career and Technical Education (CTE) Center at Brazosport High School, according to a news release. The 76,000-square-foot facility is being funded through a 2019 bond and has an estimated completion date of December 2024. The district partnered with VLK Architects for the building’s design.

“VLK is very fortunate to have partnered with Brazosport ISD in the design of the Brazosport High School CTE Center,” said VLK Architects Principal Monika Castillo. “The new building and addition will allow the district to continue delivering instruction for the betterment of their students’ futures.”

The new building will connect directly to the main school and offer specialized spaces for programs including cosmetology, floral design, veterinary technology, journalism, and others. It will also feature workshops for welding, architectural engineering, and construction, each with a dedicated classroom space and shop area with access to an outdoor, secured workspace. The new spaces were designed to include natural light and exterior finishes that complement the rest of campus.

The news release reports that the cosmetology lab will include installations for hair styling, pedicures and manicures, and facial treatments, while the vet tech lab will have space for animal treatment and grooming. The facility will also include a podcast room, green screen room, and control room for the school’s AV and multimedia production programs.

“Our new Career and Technical Education building will serve as a hub of innovation, fostering creativity, collaboration, and hands-on learning,” said Brazosport ISD Superintendent Danny Massey. “This facility will provide our students with access to cutting-edge technology, modern workshops, and industry-standard equipment across a wide range of disciplines. Together, we will build not only a physical structure for our students today, but also a legacy of excellence for generations to come.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

  • Preparing for the Next Era of Healthcare Education, Innovation

    Across the country, public universities and community colleges are accelerating investments in healthcare education facilities as part of a broader strategy to address workforce shortages, modernize outdated infrastructure, and expand clinical training capacity. These projects, which are often located at the center of campus health and science districts, are no longer limited to traditional classrooms.

  • UCNJ Launches $30M Modernization of Physical Education Center

    The Union College of Union County (UCNJ) in Cranford, N.J., recently broke ground on a new $30-million modernization project for its Physical Education Center (PECK), according to a news release. The college partnered with DIGroup Architecture for the project’s design, transitioning the existing 42,000-square-foot structure into a campus hub for student athletics and campus life.

Digital Edition