DFW-Area K–12 District Breaks Ground on New STEAM Academy

Last week, the Waxahachie Independent School District near Dallas, Texas, held a groundbreaking ceremony for a new STEAM school, according to a news release. The Wilemon STEAM Academy will have space for about 800 students in grades K–5 and was designed by VLK Architects. Funding for the project came from a bond that local voters passed in May 2023.

The campus will measure in at 102,000 square feet and feature amenities like an open-concept library; creation spaces featuring a wood engraver, LEGO station, and science and robotics labs; an outdoor courtyard; recording studio; flex spaces; a gymnasium; and a cafeteria. The release reports that the new school’s mission is to “create an innovative learning environment in which students thrive, using critical thinking, creativity, communication, and collaboration to solve real-world problems and promote career awareness.”

“The construction of a new home for the incredibly successful Wilemon STEAM Academy is an exciting step in the continued growth of Waxahachie ISD,” said Jonathan Aldis, VLK Architects Principal. “The new campus allows for even more students in Waxahachie to engage in an education focused on science, technology, engineering, arts, and math in an innovative and collaborative learning environment.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Chicago District Completes Construction on New Elementary School

    North Chicago School District 187 in North Chicago, Ill., recently held a ribbon-cutting ceremony for the new Forrestal Elementary School, according to a news release. The new school marks a major investment in military-connected students and families at Naval Station Great Lakes.

  • Vanderbilt to Partner with ABM for Campus Preservation and Modernization

    Vanderbilt University recently announced that it has selected ABM Performance Solutions for a preservation and modernization project at its New York City campus, according to a news release. ABM will deliver its end-to-end ABM Performance Solutions (APS) model to manage critical operations during renovation and maintenance.

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • Children walking along bright school corridor with motion blur

    How Next-Gen Design Is Reshaping the Student Experience

    The environments where students learn play a crucial role in shaping their growth in and out of the classroom. By centering design on well-being, flexibility, and purpose, districts can ensure their facilities remain vibrant community assets for many years to come.