FAU Temporarily Closes Building that Opened This Year

Florida Atlantic University’s John D. MacArthur Campus in Jupiter, Fla., recently announced the temporary closure of an academic building that was completed in Nov. 2022 and opened in January of this year, according to local news. The university announced that residents of the Stiles-Nicholson Brain Institute building will be displaced for about six months following problems with its control systems.

The university partnered with the Stiles-Nicholson Foundation for the building’s development, according to the University Press, and its mission is focused on education, research, and community outreach. Research focuses on brain disorders including autism, addiction, brain cancer, and Alzheimer’s disease.

The facility stands three stories and measures in at 58,000 square feet. The Palm Beach Post reports that the building’s final inspection—conducted by a state fire marshal and the university’s building code administrator—did not reveal the problem that caused the building’s closure. University spokeswoman Cara Perry said that the building was evacuated out of “an abundance of caution” and that “progress is being made” toward the problem’s resolution.

“The Stiles-Nicholson Brain Institute building on FAU’s MacArthur campus in Jupiter is undergoing an evaluation of its building services systems due to some apparent malfunctions,” said Joshua Glanzer, FAU Associate Vice President for Public Affairs and Media Relations. “In an abundance of caution, most of the occupants of the building have moved to alternate spaces on the Jupiter campus while these issues are evaluated and addressed. Initial estimates suggest the project may take up to six months, but it is far too early to establish a firm time frame. The Stiles-Nicholson Brain Institute’s work and operations will be uninterrupted during this time.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Florida District Selects Designer for K–8 Prototype Campus

    St. Lucie Public Schools in St. Lucie, Fla., recently announced that it has selected Spiezle Architectural Group, Inc., to design its new Western Grove K–8 prototype campus, according to a news release. Construction on the 217,500-square-foot facility will begin in February 2025 and is scheduled for completion in August 2026.

  • Minnesota K–12 District Completes New Elementary School

    Rock Ridge Public Schools in Virginia, Minn., recently announced that construction of the district’s newest elementary school is complete. North Star Elementary cost $28.5 million and has the capacity for 600 students in grades 3–6, according to a news release.

  • college student sitting at a desk, studying on a glowing laptop with geometric shapes representing technology in the background

    Pearson Introduces New AI-Powered Study Tools

    Digital learning company Pearson has launched several new AI-powered tools to help provide students personalized help from within their e-textbooks or study platforms.

  • San Diego High School Hits Construction Milestone

    Part of a whole-site modernization project at Mira Mesa High School in San Diego, Calif., recently reached a construction milestone. The final steel beam of the new classroom and student services facility was put into place, completing the building’s structural framework.

Digital Edition