UAB Completes Phase I of STEM Complex Construction

The University of Alabama at Birmingham recently announced that the first phase of construction on a new Science and Engineering Complex is complete, according to a news release. The university is partnering with Hoar Construction on the three-phase project, which will unite all of the university’s basic science undergraduate and graduate programs underneath one roof. Phase I consists of a 138,842-square-foot, four-story facility featuring labs and classrooms for biology, chemistry, and physics, as well as administrative space.

“We are proud to deliver this project to the students, faculty, and staff at UAB, as the new Science and Engineering Complex represents a significant commitment to advancing the university’s prowess as a key research hub that enhances career opportunities and bolsters economic development across Alabama,” said Chad Holland, project executive at Hoar. “This project was completed at the highest quality for the next generation of students, leaders and innovators within science and engineering. Hoar remains steadfast in our commitment to build top-tier projects across all realms of higher education, and we are honored to contribute to the university’s growth in our hometown of Birmingham.”

The facility was designed as a team-learning environment that will promote student collaboration between both students and faculty in different scientific disciplines. Specialized workspaces include an optics lab, research labs for student shadowing, and cold-growth environment rooms.

The news release reports that Hoar used computerized, 3D models of the structure to address design concerns during the construction process. The models were used to assess material quantities, optimize item placement, and identify design conflicts. Additionally, Building Information Modeling (BIM) were used to streamline the installation of plumbing and electrical components to save both time and cost.

The university is also partnering with lead architect Goodwyn, Mills & Cawood for the building’s design, as well as Lord Aeck Sargent (LAS) for lab and research space consulting.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • UCNJ Launches $30M Modernization of Physical Education Center

    The Union College of Union County (UCNJ) in Cranford, N.J., recently broke ground on a new $30-million modernization project for its Physical Education Center (PECK), according to a news release. The college partnered with DIGroup Architecture for the project’s design, transitioning the existing 42,000-square-foot structure into a campus hub for student athletics and campus life.

  • Los Angeles City College Breaks Ground on New Administration, Workforce Building

    Los Angeles City College (LACC) in Los Angeles, Calif., recently broke ground on a new $72-million administrative facility, according to a news release. The Cesar Chavez Administration and Workforce Building will stand four stories, cover 67,230 square feet, and play home to a wide variety of the school’s educational and administrative services.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

Digital Edition