UAB Completes Phase I of STEM Complex Construction

The University of Alabama at Birmingham recently announced that the first phase of construction on a new Science and Engineering Complex is complete, according to a news release. The university is partnering with Hoar Construction on the three-phase project, which will unite all of the university’s basic science undergraduate and graduate programs underneath one roof. Phase I consists of a 138,842-square-foot, four-story facility featuring labs and classrooms for biology, chemistry, and physics, as well as administrative space.

“We are proud to deliver this project to the students, faculty, and staff at UAB, as the new Science and Engineering Complex represents a significant commitment to advancing the university’s prowess as a key research hub that enhances career opportunities and bolsters economic development across Alabama,” said Chad Holland, project executive at Hoar. “This project was completed at the highest quality for the next generation of students, leaders and innovators within science and engineering. Hoar remains steadfast in our commitment to build top-tier projects across all realms of higher education, and we are honored to contribute to the university’s growth in our hometown of Birmingham.”

The facility was designed as a team-learning environment that will promote student collaboration between both students and faculty in different scientific disciplines. Specialized workspaces include an optics lab, research labs for student shadowing, and cold-growth environment rooms.

The news release reports that Hoar used computerized, 3D models of the structure to address design concerns during the construction process. The models were used to assess material quantities, optimize item placement, and identify design conflicts. Additionally, Building Information Modeling (BIM) were used to streamline the installation of plumbing and electrical components to save both time and cost.

The university is also partnering with lead architect Goodwyn, Mills & Cawood for the building’s design, as well as Lord Aeck Sargent (LAS) for lab and research space consulting.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • South Texas K–12 District Debuts Region’s First Electric Bus Fleet

    The Valley View Independent School District in Pharr, Texas, recently announced a partnership with Highland Electric Fleets to launch the district’s—and the region’s—first fleet of all-electric school buses, according to a news release.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • Creating Long-Term Sustainability on College Campuses Through Fair Student Housing

    The quality of student housing can have a significant impact on an individual’s college experience. Today’s higher education institutions face mounting challenges, including declining enrollment, low retention rates between the first and second years, and a rise in student mental health concerns. Thoughtfully designed living spaces can help address these issues by creating environments that promote both academic focus and personal well-being.

Digital Edition