Clark Atlanta University Announces Construction of Three New Buildings

Clark Atlanta University in Atlanta, Ga., recently announced plans to build three new campus buildings simultaneously, according to a news release. The Board of Trustees recently approved the decision to build a new freshman residence hall, a second dining hall, and a student success center with the end goal of boosting the student experience.

Exact dates for the beginning and completion of construction have yet to be announced. Funding will come from a combination of debt financing and contributions from a food-service vendor, the news release reports.

“Today’s decision by Clark Atlanta University's Board is a testament to our unwavering commitment to our scholars’ success,” said University President George T. French, Jr., Ph.D. “It is a direct response to the increasing enrollment and the need for on-campus student housing.”

The new residence hall will have capacity for 400 students. It will be the first on-campus residence hall to be built and owned by the university since the construction of Brawley Hall in 1996. The campus’ Bumstead/Ware site will also gain a second dining hall to increase on-campus dining opportunities for students.

Finally, the new student success center will streamline programs and resources that support student success and wellness. Its ultimate goal, according to the news release, is to “focus on fostering collaborative efforts and accelerating initiatives to enhance student persistence and completion.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • KWK Architects Announces Full Transition to Lawrence Group Branding

    KWK Architects recently announced that it will complete its transition to the Lawrence Group brand effective July 1, according to a news release. The merger marks the end of a three-year strategic integration process that began in March 2023 to unite the firms.

  • Montclair State University Starts Construction on $120M STEM Building

    Montclair State University in Montclair, N.J., recently broke ground on a new $120-million Interdisciplinary Science Building, according to university news. The university partnered with HoK Architects for the project’s design, and it’s scheduled to open in time for the 2028–29 academic year.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.