Tennant Launches Two New Walk-Behind Floor Scrubbers

Cleaning equipment and solutions provider Tennant Company recently launched two new products—the T260 and the T391—to add to its fleet of walk-behind floor scrubbers, according to a news release. The products will be available to order in October 2023.

The T260 offers a 20-inch scrubber intended for quick and straightforward use, and its size allows for easy visibility while cleaning cramped spaces. The mid-size T391 offers two scrub-path sizes, 28 inches and 32 inches. Both were designed for use in healthcare, education, retail, and public environments, the news release reports.

Features of the T260 include a one-button stop and start function; battery meter display; a recovery tank that offers full access and visibility; clear sightlines of operation; and water pick-up ability. The T391’s larger scrub path enables faster productivity and comes with larger solution and recovery tanks. Its self-leveling scrub head allows for ease of use across different surfaces. The pre-programmed standard and eco-mode settings also allow for easy operation with minimal user training.

“We’re proud to have two more reasons why facility managers should choose Tennant,“ said Pat Schottler, Tennant’s Vice President of Global Marketing. “It’s been a big year for us, as we continue to introduce new machines to help serve our customers across all facility types. At the heart of these innovations is giving the customer more options—cleaning looks different for each facility. The new T260 and T391 are great choices for customers prioritizing ease-of-use, powered by best-in-class cleaning technology and backed by the Tennant experience—all at a competitive price.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Benson Polytechnic High School in Portland, OR

    Preserving Legacy, Designing for the Future

    As historic academic buildings age, institutions face a difficult decision: preserve and adapt or demolish and rebuild. How do we honor the legacy of these spaces while adapting them to meet the needs of modern learners?

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • University of Arizona Approves New Residence Hall

    The Arizona Board of Regents recently approved plans for a new residence hall at the University of Arizona in Tucson, Ariz., according to a news release. The new facility is scheduled to open in fall 2028 and have the capacity for more than 1,200 students, enforcing a new university expectation that all first-year students live on campus.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.