Tennant Launches Two New Walk-Behind Floor Scrubbers

Cleaning equipment and solutions provider Tennant Company recently launched two new products—the T260 and the T391—to add to its fleet of walk-behind floor scrubbers, according to a news release. The products will be available to order in October 2023.

The T260 offers a 20-inch scrubber intended for quick and straightforward use, and its size allows for easy visibility while cleaning cramped spaces. The mid-size T391 offers two scrub-path sizes, 28 inches and 32 inches. Both were designed for use in healthcare, education, retail, and public environments, the news release reports.

Features of the T260 include a one-button stop and start function; battery meter display; a recovery tank that offers full access and visibility; clear sightlines of operation; and water pick-up ability. The T391’s larger scrub path enables faster productivity and comes with larger solution and recovery tanks. Its self-leveling scrub head allows for ease of use across different surfaces. The pre-programmed standard and eco-mode settings also allow for easy operation with minimal user training.

“We’re proud to have two more reasons why facility managers should choose Tennant,“ said Pat Schottler, Tennant’s Vice President of Global Marketing. “It’s been a big year for us, as we continue to introduce new machines to help serve our customers across all facility types. At the heart of these innovations is giving the customer more options—cleaning looks different for each facility. The new T260 and T391 are great choices for customers prioritizing ease-of-use, powered by best-in-class cleaning technology and backed by the Tennant experience—all at a competitive price.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Planning with Clarity: Using AI to Make Better Campus Decisions, Not Just Better Designs

    Higher education leaders are being asked to make increasingly high-stakes decisions about campus facilities amid greater uncertainty than ever before. Social and economic pressures, shifting enrollment, and evolving learning models compete with growing deferred maintenance needs to strain even the most robust infrastructure budgets.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • Children walking along bright school corridor with motion blur

    How Next-Gen Design Is Reshaping the Student Experience

    The environments where students learn play a crucial role in shaping their growth in and out of the classroom. By centering design on well-being, flexibility, and purpose, districts can ensure their facilities remain vibrant community assets for many years to come.