Tennant Launches Two New Walk-Behind Floor Scrubbers

Cleaning equipment and solutions provider Tennant Company recently launched two new products—the T260 and the T391—to add to its fleet of walk-behind floor scrubbers, according to a news release. The products will be available to order in October 2023.

The T260 offers a 20-inch scrubber intended for quick and straightforward use, and its size allows for easy visibility while cleaning cramped spaces. The mid-size T391 offers two scrub-path sizes, 28 inches and 32 inches. Both were designed for use in healthcare, education, retail, and public environments, the news release reports.

Features of the T260 include a one-button stop and start function; battery meter display; a recovery tank that offers full access and visibility; clear sightlines of operation; and water pick-up ability. The T391’s larger scrub path enables faster productivity and comes with larger solution and recovery tanks. Its self-leveling scrub head allows for ease of use across different surfaces. The pre-programmed standard and eco-mode settings also allow for easy operation with minimal user training.

“We’re proud to have two more reasons why facility managers should choose Tennant,“ said Pat Schottler, Tennant’s Vice President of Global Marketing. “It’s been a big year for us, as we continue to introduce new machines to help serve our customers across all facility types. At the heart of these innovations is giving the customer more options—cleaning looks different for each facility. The new T260 and T391 are great choices for customers prioritizing ease-of-use, powered by best-in-class cleaning technology and backed by the Tennant experience—all at a competitive price.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Epson Receives Seven AV Industry Awards

    Projectors manufacturer Epson recently announced that it received multiple awards across the Higher Ed AV Awards, SCN Stellar Service Awards, and InfoComm 2025, according to a news release. The company was recognized for three projectors from its PowerLite L-Series line, accessories, installation process, and its customer support team.

  • Photo courtesy of Spiezle Architectural Group, Inc.

    West Melbourne School for Science Completes Expansion Project

    The West Melbourne School for Science, which serves students grades PreK–6 in West Melbourne, Fla., recently completed a 12,450-square-foot elementary school expansion, according to a news release.

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Case Study Highlights Texas District’s Campus Security Upgrades

    The Taft Independent School District near Corpus Christi, Texas, recently partnered with Intech Southwest Services to revamp its campus security technology system, according to a news release. Intech has released a case study on its website detailing the process that advanced the district’s technology by more than 20 years in less than three weeks.

Digital Edition