Texas K–12 District Utilizes Federal Grant Money for VR Equipment

The San Isidro Independent School District in south Texas recently announced that it used a federal grant program to purchase virtual reality (VR) headsets for its middle- and high-school students, according to a news release. The district was one of 13 in the Texas Region One Educational Services Center service area to take advantage of the “GEAR UP Pathways to the Future” grant to purchase ClassVR from Avantis Education.

ClassVR is an all-in-one VR/AR headset that features thousands of pieces of educational content across a variety of K–12 subject areas. The package features all hardware and software, tools, training, and support and implementation services needed for school administrators to deploy the technology. Content ranges from the inside of an atom to an Arctic encounter with polar bears to a WWI trench.

“The GEAR UP program has been great for bringing technology and training to our district,” said San Isidro ISD’s GEAR UP facilitator, Cristobal Vela. “ClassVR provides an excellent opportunity to have students experience places that they otherwise would never be able to visit.”

The news release reports that Avantis recently aligned more than 400 of its ClassVR lessons to meet U.S. state standards in science, English/language arts, and social studies. ClassVR equipment qualifies for both the GEAR UP grant and ESSER funds through its ability to help teachers address learning loss.

“Utilizing grant funding for ClassVR is really a great way to support equity in schools because it gives students access to cutting-edge technology and allows those who might not have had opportunities to travel, to experience different places through the power of virtual reality,” said Huw Williams, CEO of Avantis Education. “GEAR UP grants offer a great opportunity to bring technologies like ClassVR into schools to help enhance lessons and support academic success in secondary school and beyond.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Secret to Efficient, On-Time School Infrastructure & Modernization Projects is All in the Preparation

    Warmer weather and longer days make summer the ideal time for construction and modernization projects at educational facilities. School boards and construction firms must coordinate effectively to ensure that these projects do not extend even a single day into the school year and impede classroom operation.

  • Can AI Help Build Stronger Communities in Student Housing?

    Student housing success is shifting from operational performance to student experience, with belonging now at the center. A recent 2025 report underscores a growing emphasis on student well-being, community, and engagement, signaling that expectations now extend beyond logistics to ensure students feel supported in their living environments. AI is enabling that shift by reducing administrative workload and giving teams more time to focus on meaningful student engagement.

  • S4L Announces 2026 Education Design Showcase Winners

    Spaces4Learning is thrilled to announce the winners of the 2026 Education Design Showcase! Now in its 27th year, the annual awards program honors innovative solutions in planning, design, architecture, and construction across K–12 and higher education.

  • Wenger Names New Vice President of Sales for Performing Arts, Controls

    Wenger Corporation, which provides products and solutions for music and theater education, performing arts and athletic storage, recently announced the hiring of a new Vice President of Sales for Performing Arts and Controls.