Western Governors University Selects AI Writing Assistance Partner

Online university Western Governors University recently announced a partnership with AI writing assistance provider Grammarly, according to a news release. The university will provide access to Grammarly’s real-time writing support services—and new Writing Score API—to all faculty and students. The goal of the collaboration is to empower the university’s working adult and remote students to build critical communication skills.

The Writing Score API provides real-time quality checks on documents to provide feedback and suggestions that ensure correct, clear, and engaging writing, the news release reports. The service will be deployed to WGU students over the summer and to the education market at large later in 2024.

“Even in the generative AI–connected workforce, writing is as essential as ever, with knowledge workers spending 19 hours per week on written communication,” said Jenny Maxwell, Head of Grammarly for Education. “To ensure students are prepared to succeed in today’s workplace, they must learn effective writing and editing skills. Grammarly’s partnership with WGU will empower students to improve their writing skills, increase the likelihood of earning a degree, and ultimately maximize their career opportunities.”

The service will allow students to submit written assignments with a minimum of 30 words and receive a writing score on a 1–100 scale. The score reflects potential improvements to grammar, spelling, punctuation, sentence clarity, word choice variety, and tone, according to the news release. The Writing Score API expands existing writing score technology to a wider variety of its applications.

“WGU is thrilled to partner with Grammarly and pilot the Writing Score API at scale,” said WGU Senior Vice President of Academic Delivery Debbie Fowler. “WGU makes higher education and professional career advancement attainable for everyone by identifying system-wide barriers and investing in solutions to eliminate them. We are excited to embed this in-the-moment feedback into how we teach while our instructors remain student-centric. By incorporating this AI technology, we can provide truly personalized learning and meet students where they are.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • St. John Fisher University

    Classroom Revitalization – Basil Hall Room 216

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. St. John Fisher University's Basil Hall Room 216 Classroom Revitalization has been recognized with an EDS 2026 Project of Distinction award in the category of Spaces.

  • St. Lucie County, Fla., Breaks Ground on New K–8 School

    St. Lucie Public Schools in St. Lucie County, Fla., recently held a groundbreaking ceremony for a new K–8 school, according to a news release. The district partnered with Spiezle Architectural Group, Inc., for the design of the upcoming Ft. Pierce K–8 School, which comprises six buildings covering 215,000 square feet.

  • Cleveland High School Breaks Ground on Modernization

    Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site.