Sea Turtle Hospital at University of Florida Under Construction

The University of Florida’s Whitney Research Laboratory for Marine Bioscience recently began construction on a new Sea Turtle Hospital for its campus in St. Augustine, Fla., according to a news release. The new facility will include multiple research labs, education areas, and a sea turtle research center and hospital. The university is partnering with DPR Construction on the $41.2-million complex.

“The addition of the Marine Research Institute Building and the Sea Turtle Research Center and Hospital represents a significant milestone for the University of Florida and our efforts in marine science education and conservation,” said Whitney Laboratory Sea Turtle Hospital Program Manager Catherine Eastman. “This facility will not only advance our research capabilities but also inspire the next generation of scientists and conservationists.”

The complex will feature a marine research and conservation discovery entryway, a scientific education path, and an outdoor classroom to facilitate learning for students and visitors. Construction is aiming for a LEED Gold certification. A 38,000-square-foot, two-story post tension cast-in-place structure is an innovation of note, featuring advanced self-performing concrete techniques, the news release reports.

“This new facility was ideated in collaboration with Whitney scientists to ensure that their workflow is prioritized in the space we build,” said DPR Project Executive Michael Boykin. “It's an exciting project that not only takes sustainability into consideration during the building process, but will contribute so much to the preservation of our iconic wildlife in Florida.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • UCNJ Launches $30M Modernization of Physical Education Center

    The Union College of Union County (UCNJ) in Cranford, N.J., recently broke ground on a new $30-million modernization project for its Physical Education Center (PECK), according to a news release. The college partnered with DIGroup Architecture for the project’s design, transitioning the existing 42,000-square-foot structure into a campus hub for student athletics and campus life.

  • Los Angeles City College Breaks Ground on New Administration, Workforce Building

    Los Angeles City College (LACC) in Los Angeles, Calif., recently broke ground on a new $72-million administrative facility, according to a news release. The Cesar Chavez Administration and Workforce Building will stand four stories, cover 67,230 square feet, and play home to a wide variety of the school’s educational and administrative services.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

Digital Edition