Florida Net-Zero High School Completes $29M Expansion Project

NeoCity Academy in Kissimmee, Fla., recently completed a 53,000-square-foot, three-story addition to its campus, according to a news release. The school partnered with construction firm Skanska on the project, which includes 26 new classrooms with collaborative learning spaces and labs. NeoCity Academy was the first net-zero high school campus in the state of Florida, the news release reports.

The expansion includes sustainability features like a photovoltaic canopy that provides solar energy as well as shade and shelter, LED lighting, and designated space for future rooftop solar panels. The project also involved detailing and expanding the school’s building envelope to reduce air leakage and control temperature, air, and humidity. Window placement and sizing were also taken into account to minimize the school’s energy use and heat gain.

“We’re excited to deliver this sustainability-focused expansion to NeoCity Academy and the School District of Osceola County,” said Skanska Vice President Daniel Abou-Jaoude. “This project is a testament to Skanska’s commitment to construct innovative and forward-thinking educational facilities throughout the state.”

The project also features a photovoltaic “mixer” space that acts as a gathering space for faculty and students. Other site improvements include a new canopy and covered walkway that create both outdoor learning spaces and increased accessibility between buildings, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Uvalde Schools Receive AI Security Technology through Grant Program

    AI-powered gun detection and emergency response technology solutions provider Omnilert recently launched the Save Haven Grant program, according to a news release. The first recipient of the grant, aimed specifically at schools that have faced gun violence, will be the Uvalde Consolidated Independent School District (Uvalde CISD) in Uvalde, Texas.

  • Extron, CENTEGIX Partner for Comprehensive School Security Solution

    Professional audiovisual solutions provider Extron recently announced a partnership with CENTEGIX, which provides rapid incident response technology, to integrate two of their top products in the name of school safety.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • S4L Launches 2025 Facilities and Construction Brief Survey

    Spaces4Learning recently launched its 2025 Facilities and Construction Brief Survey, which gathers information on K–12 and higher education construction projects nationwide from the previous year. The data we get from you, our readers, forms an industry report offering an overview of current trends in school facilities.

Digital Edition