Harvard University Breaks Ground on New Performance Center

Harvard University in Cambridge, Mass., recently broke ground on a new performance center that will play home to the American Repertory Theater, according to a news release. The university is partnering with architect and design lead Haworth Tompkins, architect of record ARC/Architectural Resources Cambridge, and construction manager Shawmut Design and Construction for the David E. and Stacy L. Goel Center for Creativity & Performance. Construction is tentatively scheduled for completion in 2026.

“We are honored to be leading the construction of the David E. and Stacey L. Goel Center for Creativity & Performance,” said executive vice president of Shawmut Design and Construction’s New England region Kevin Sullivan. “This project exemplifies our deep commitment to the community. By prioritizing environmental sustainability and adaptable design, we are building a vibrant hub for creativity and connection that will serve the local area for years to come. Our shared goal of minimizing embodied and operational carbon, maximizing wellbeing, and enhancing resiliency ensures that this center will not only be a beacon for the arts but also a pioneering global model for sustainable construction.”

The space features two flexible performance spaces: the West Stage for large-scale productions, and the East Stage as a more intimate venue. It will also include interconnected and adaptable multi-purpose spaces to support both future-readiness and creative collaboration. Other amenities include rehearsal studios and teaching spaces, a public lobby, and an outdoor performance venue, as well as dressing rooms, administrative space, technical shops, and a café.

From the sustainability angle, the building was designed to meet the Living Building Challenge core accreditation from the International Living Future Institute, the news release reports. Construction materials include laminate mass timber, reclaimed brick, and cedar cladding to minimize embodied and operational carbon. Rooftop solar panels will gather solar energy, while a green roof and thorough plantings will assist with stormwater attenuation, the news release reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • School Construction Projects Boom as Education Systems Address Aging Facilities and Growth

    Construction opportunities are almost always abundant, but currently there are more than usual construction projects being launched for public school campuses. Common objectives include major renovation or expansion of aging facilities, total replacement of inefficient classrooms, upgrades to lighting, technology, and security equipment, and adding new sports and cultural facilities.

  • KI Wall Demonstrates New Solutions at NeoCon 2025

    KI Wall attended NeoCon 2025 in Chicago, Ill., last month to showcase its new architectural wall systems and collaborations, according to a news release. Its customizable, design-forward wall solutions are intended to support creativity in work, education, and healthcare environments.

  • ClassVR headsets

    Avantis Education Revamps Hardware for ClassVR Solution

    Avantis Education recently announced the launch of two new headsets for its flagship educational VR/AR solution, ClassVR. According to a news release, the Xcelerate and Xplorer headsets expand the company’s offerings into higher education while continuing to meet the evolving needs of K–12 users.

  • The Role of Unified Communications in Hyflex Education

    Academic technology and pedagogy have evolved in ways few could have imagined a decade ago. Today, hybrid/flexible (or hyflex) learning environments — a mix of in-person and remote instruction — are the new normal. However, as promising as it sounds, making hyflex work smoothly is no small feat.

Digital Edition