SMART Technologies Introduces Solution for Neurodiverse Students

Interactive technology solutions provider SMART Technologies recently launched a new solution to support neurodiverse learners, according to a news release. The Inclusive Classroom Bundle was designed to meet the specific needs of students with autism, ADHD, dyslexia, dyspraxia, and dyscalculia. Additionally, SMART is sponsoring research in a partnership with the University of Melbourne to gather information about the lived experience of autistic and ADHD students, the news release reports.

SMART Technologies showcased the bundle for the first time at ISTE 2024. The bundle includes a SMART Board RX Series, an interactive display to engage students that comes with a seven-year warranty; customizable tool explorer stamps to imprint words, pictures, AAC symbols, and more onto the interactive display board; a Lumio Spark Plan Subscription, a web-based tool that offers a variety of learning experiences; and an optional, height-adjustable stand for smaller students.

The tools were designed to provide means beyond spoken or written language for students to engage with learning. The bundle offers features like student pacing and instructional audio to expand classroom accessibility and Universal Design for Learning.

At ISTE 2024, Dr. Matt Harrison and Jess Rowlings with the University of Melbourne discussed insights from research surrounding the lived experiences of ADHD and autistic students. It also offered actionable insights into technology that can help meet these students’ needs.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

Digital Edition