Texas Tech University Celebrates Opening of New Academic Building

Texas Tech University in Lubbock, Texas, recently held a ribbon-cutting ceremony for its new, 130,000-square-foot Academic Sciences Building (ASB), according to a news release. The facility stands three stories and broke ground about two and a half years ago. It plays home to five academic departments in the College of Arts & Sciences: Biological Sciences, Chemistry & Biochemistry, Geosciences, Physics & Astronomy, and Psychological Sciences.

It will also house four core interdisciplinary research labs (human sampling, a clean room, biosafety level 2, and biosafety level 3), as well as academic classrooms, general laboratory and research space, faculty offices, and public gathering spaces, the news release reports. The building’s courtyard includes an IGOR telescope from White Sands Missile Range.

“The Academic Sciences Building is a testament to Texas Tech’s vision for the future while honoring the traditional beauty of our campus,” said Lawrence Schovanec, Texas Tech President. “As the first building to open in our university’s second century, it embodies our commitment to interdisciplinary collaboration, cutting-edge research and exceptional student experiences.”

The project cost $112.5 million, $12.5 million of which came from an appropriation from the Texas Legislature during its 2021 session.

“This space will allow not only existing students to thrive and reach new heights but will have significant impact on our ability to attract future students and additional outstanding faculty,” said Tosha Dupras, dean of the College of Arts & Sciences. “I look forward to two weeks from now, when the hallways, classrooms and labs will be filled with students and faculty.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • AP Construction Breaks Ground on Two Projects for Austin ISD

    Adolfson & Peterson Construction (AP) recently announced that it has broken ground on two renovation projects for the Austin Independent School District, according to a news release. The work at McCallum and Anderson High Schools totals 97,350 square feet and is scheduled for completion in January 2027.

  • Tufts University Breaks Ground on Two New Residence Halls

    Tufts University in Medford, Mass., recently broke ground on two new residence halls with a total capacity of 664 beds, according to local news. The project’s ultimate goal is to expand on-campus housing and reduce pressure on the local housing market.

  • Los Angeles City College Breaks Ground on New Administration, Workforce Building

    Los Angeles City College (LACC) in Los Angeles, Calif., recently broke ground on a new $72-million administrative facility, according to a news release. The Cesar Chavez Administration and Workforce Building will stand four stories, cover 67,230 square feet, and play home to a wide variety of the school’s educational and administrative services.

  • New Kent State Academic Building Earns LEED Silver Certification

    Kent State University in Kent, Ohio, recently announced that its newest academic building, Crawford Hall, has earned a LEED Silver certification from the U.S. Green Building Council, according to a news release. The facility was recognized for its innovative design, water conservation technologies, energy-efficient systems, and sustainable construction materials, among other features.