Fellowes Expands Lines of Monitor, Laptop Accessories

Interior workplace solutions provider Fellowes recently announced that it is expanding two of its popular product lines. The extensions to its Sena and Rising lines will offer new degrees of functionality and aesthetic appeal to a wide variety of corporate and educational environments, according to a news release.

Fellowes’ Sena line of monitor solutions now includes six new configurations. The SenaEX4 and SenaEX6 monitor arms can respectively hold four and six monitors, with additional options providing four quad configurations and two six-monitor configurations. The products assist with multi-monitor environments and provide additional flexibility regarding screen placement and comfort.

Fellowes is also releasing two new laptop holders, one for the Rising series and one for the Sena series. The products integrate with existing Fellowes products to provide secure and aesthetically pleasing arm support within the workspace.

The product line extensions come in black, white, or siler finishes. The models are Level 2 Certified and BIFMA Complaint, the news release reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.

  • UT-San Antonio Begins Residence Hall Renovations

    The University of Texas at San Antonio recently began a $6-million renovation project to one of its residence halls, according to a news release. Originally completed in 1986, Chisolm Hall measures in at 120,860 square feet and is the oldest and largest residence hall on campus.

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.

  • Missouri K–12 District Cuts Ribbons on Two New Middle Schools

    Springfield Public Schools in Springfield, Mo., recently celebrated the completion of two new middle school facilities with ribbon-cutting ceremonies, according to a district news release. The district officially opened the new Pipkin Middle School and Reed Academy on Sept. 3, both of which were funded through the $220-million Proposition S bond program approved by voters in 2023.