Fellowes Expands Lines of Monitor, Laptop Accessories

Interior workplace solutions provider Fellowes recently announced that it is expanding two of its popular product lines. The extensions to its Sena and Rising lines will offer new degrees of functionality and aesthetic appeal to a wide variety of corporate and educational environments, according to a news release.

Fellowes’ Sena line of monitor solutions now includes six new configurations. The SenaEX4 and SenaEX6 monitor arms can respectively hold four and six monitors, with additional options providing four quad configurations and two six-monitor configurations. The products assist with multi-monitor environments and provide additional flexibility regarding screen placement and comfort.

Fellowes is also releasing two new laptop holders, one for the Rising series and one for the Sena series. The products integrate with existing Fellowes products to provide secure and aesthetically pleasing arm support within the workspace.

The product line extensions come in black, white, or siler finishes. The models are Level 2 Certified and BIFMA Complaint, the news release reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Baton Rouge Center for Visual and Performing Arts

    Baton Rouge Center for Visual and Performing Arts

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Baton Rouge Center for Visual and Performing Arts has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Spaces4Learning Launches 2026 Facilities and Construction Brief Survey

    Spaces4Learning recently launched the 2026 Facilities and Construction Brief Survey, which collects data on the previous year’s K–12 and higher education construction projects nationwide.

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.