Fellowes Expands Lines of Monitor, Laptop Accessories

Interior workplace solutions provider Fellowes recently announced that it is expanding two of its popular product lines. The extensions to its Sena and Rising lines will offer new degrees of functionality and aesthetic appeal to a wide variety of corporate and educational environments, according to a news release.

Fellowes’ Sena line of monitor solutions now includes six new configurations. The SenaEX4 and SenaEX6 monitor arms can respectively hold four and six monitors, with additional options providing four quad configurations and two six-monitor configurations. The products assist with multi-monitor environments and provide additional flexibility regarding screen placement and comfort.

Fellowes is also releasing two new laptop holders, one for the Rising series and one for the Sena series. The products integrate with existing Fellowes products to provide secure and aesthetically pleasing arm support within the workspace.

The product line extensions come in black, white, or siler finishes. The models are Level 2 Certified and BIFMA Complaint, the news release reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Architectural Power for the Modern Campus Landscape

    For generations, an outdoor classroom only required a textbook and a patch of grass. Today, not only has the laptop replaced the printed pages, the rise of agile learning has turned campuses into study halls with students listening to lectures and researching topics from quads, gardens, and plazas. The challenge for architects and facility managers is to provide connectivity without cluttering the landscape with visual eyesores or creating safety hazards with extension cords.

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.

  • Designing Third Spaces That Do What AI Can't

    In 2026, education is evolving faster than ever. With AI reshaping everything from lesson planning to personalized instruction, schools and universities are turning their attention to what AI can’t replicate: spaces that foster collaboration, community, and creativity.

  • Dallas ISD Voters Approve $6.2B Bond Package

    Dallas ISD voters have approved a record-setting $6.2-billion bond package that district leaders say will modernize aging campuses, eliminate portable classrooms and reshape learning environments across one of the nation’s largest school systems.