Harvard University Breaks Ground on New Performance Venue

Harvard University in Cambridge, Mass., recently announced that construction has begun on a new performing arts center for the campus, according to a news release. The David E. and Stacey L. Goel Center for Creativity & Performance will serve as the new home for the American Repertory Theater (A.R.T.), as well as a wide variety of performances, public gatherings, teaching opportunities, and international research.

The university partnered with Haworth Tompkins as the architect and design lead, ARC/Architectural Resources Cambridge as the architect of record, and Shawmut Design and Construction as the project’s construction manager.

“We are honored to be leading the construction of the David E. and Stacey L. Goel Center for Creativity & Performance,” said Kevin Sullivan, the Shawmut New England region’s executive vice president. “This project exemplifies our deep commitment to the community. By prioritizing environmental sustainability and adaptable design, we are building a vibrant hub for creativity and connection that will serve the local area for years to come. Our shared goal of minimizing embodied and operational carbon, maximizing wellbeing, and enhancing resiliency ensures that this center will not only be a beacon for the arts but also a pioneering global model for sustainable construction.”

The facility will include interconnected and adaptable multi-use spaces to support creativity. It will feature two performance venues: the West Stage for large-scale productions and the East Stage for smaller ones. Other amenities will include naturally lit rehearsal studios and teaching spaces, a large public lobby, an outdoor performance space, dressing rooms and technical shops, administrative offices, and a café, the news release reports.

From a sustainability perspective, the building’s water and electric utilities will be supplied by the university’s new, lower-carbon District Energy Facility. It will also use rooftop solar panels and natural ventilation to reduce energy use, while a green roof and extensive landscaping will help with stormwater attenuation.

Construction has an estimated completion date of 2026, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • School Construction Projects Boom as Education Systems Address Aging Facilities and Growth

    Construction opportunities are almost always abundant, but currently there are more than usual construction projects being launched for public school campuses. Common objectives include major renovation or expansion of aging facilities, total replacement of inefficient classrooms, upgrades to lighting, technology, and security equipment, and adding new sports and cultural facilities.

  • KI Wall Demonstrates New Solutions at NeoCon 2025

    KI Wall attended NeoCon 2025 in Chicago, Ill., last month to showcase its new architectural wall systems and collaborations, according to a news release. Its customizable, design-forward wall solutions are intended to support creativity in work, education, and healthcare environments.

  • ClassVR headsets

    Avantis Education Revamps Hardware for ClassVR Solution

    Avantis Education recently announced the launch of two new headsets for its flagship educational VR/AR solution, ClassVR. According to a news release, the Xcelerate and Xplorer headsets expand the company’s offerings into higher education while continuing to meet the evolving needs of K–12 users.

  • The Role of Unified Communications in Hyflex Education

    Academic technology and pedagogy have evolved in ways few could have imagined a decade ago. Today, hybrid/flexible (or hyflex) learning environments — a mix of in-person and remote instruction — are the new normal. However, as promising as it sounds, making hyflex work smoothly is no small feat.

Digital Edition