Minnesota District Completes Major Renovations, Expansions to High School

White Bear Lake Area Schools in White Bear Lake, Minn., recently announced that it has completed the renovation and expansion of White Bear Lake Area High School, according to a news release. The school’s final addition, a new 845-seat Performing Arts Center, was finished in November. The district partnered with Wold Architects and Engineers for the project, which involved 285,000 square feet of renovation and 375,000 square feet of additions.

Funding for the project came from a $326-million bond request that local voters approved in November 2019. Previously, the high school’s students were split between the North Campus (for freshmen and sophomores) and the South Campus (for juniors and seniors). The primary goal was to unite the whole student body beneath one roof, which involved significant improvements to the North Campus facility.

“This project is about more than just a building—it’s about creating a future for our students that reflects the values and voices of our community,” said White Bear Lake Area Schools Superintendent Wayne Kazmierczak. “By uniting all of our high school students and staff under one campus, we’ve created an environment where collaboration, growth and opportunity thrive. This school ensures that our students are not only prepared for today but are ready to meet the challenges of tomorrow, and we’re proud to be in a space that honors our past while embracing the potential of our future.”

The school is designed around career pathways programming and features a series of interconnected flexible learning spaces called Learning Studios. Beyond the three-story classroom and specialty lab space addition—and the Performing Arts Center—other amenities include a five-station athletics field house, a 200m track, and a student union with dining options and event space.

“Our design approach for White Bear Lake Area High School was focused on breaking down traditional barriers to learning by creating open, flexible spaces that empower students to take control of their educational experience,” said Wold Architects and Engineers Partner Paul Aplikowski. “The new Learning Studios, collaborative areas and dynamic seating options reflect a forward-thinking vision for how education can adapt to meet the needs of every student. This school stands as a testament to the community’s commitment to fostering innovation, engagement and lifelong learning, and we are honored to have played a role in bringing that vision to life.”

The district also partnered with Kraus-Anderson as construction manager, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Myrtle Grove Elementary

    Phased Construction Keeps Students on Campus During Rebuild

    When Escambia County School District needed to replace most of Myrtle Grove Elementary School in Pensacola, Fla., it had three distinct challenges: honor the school's legacy in the community, bring state-of-the-art learning environments to the county, and be seamlessly built on the same site as the active school campus.

  • FGCU Breaks Ground on New Health Sciences Building

    Florida Gulf Coast University (FGCU) has launched construction on a major new academic facility that leaders say will reshape healthcare education in Southwest Florida for decades to come, according to university news.

  • Baton Rouge Center for Visual and Performing Arts

    Baton Rouge Center for Visual and Performing Arts

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Baton Rouge Center for Visual and Performing Arts has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • Secret to Efficient, On-Time School Infrastructure & Modernization Projects is All in the Preparation

    Warmer weather and longer days make summer the ideal time for construction and modernization projects at educational facilities. School boards and construction firms must coordinate effectively to ensure that these projects do not extend even a single day into the school year and impede classroom operation.