Zurn Elkay Announces Updated Line of Filtered Bottle Filling Stations

Zurn Elkay Water Solutions recently released an updated line of its Elkay Filtered Bottle Filling Stations, according to a news release. The new line features a sleeker design and functional upgrades to help simplify filter maintenance and reduce long-term labor costs. The ezH2O Bottle Fillers, which debuted in 2010, were designed to reduce lead, PFOA/PFOS, and other contaminants.

The units were designed for public spaces like schools, universities, office spaces, gyms, and more. The updated line features the new colors Midnight Black, Arctic White, and Standard Gray. “With the 51600C High-Capacity Replacement Filter, the filter life is doubled to 6,000 gallons and is certified to NSF/ANSI 42, 53 and 401 for the reduction of lead, microplastics, cysts, Class 1 particulate and chlorine taste and odor. Elkay’s WaterSentry 71300C is also rated for the reduction of PFOA/PFOS, two prevalent PFAS chemicals, commonly known as ‘forever chemicals’ for the highest-performing filtration option,” according to the news release.

Other features include a drop-down wrapper, LED filter status display, and an automatic filter light reset. Clients can track data like the number of bottles saved, water usage, and filter status, as well as schedule flushing events to keep plumbing lines clean.

More information is available on the Zurn Elkay website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.

  • Planning with Clarity: Using AI to Make Better Campus Decisions, Not Just Better Designs

    Higher education leaders are being asked to make increasingly high-stakes decisions about campus facilities amid greater uncertainty than ever before. Social and economic pressures, shifting enrollment, and evolving learning models compete with growing deferred maintenance needs to strain even the most robust infrastructure budgets.

  • Auburn University Debuts $224M STEM + Agricultural Sciences Complex

    Auburn University in Auburn, Ala., recently opened its new $224-million STEM + Agricultural Sciences Complex, the largest research construction project in the university’s history, according to university news. The facility measures more than 265,000 square feet and brings six departments from the College of Agriculture and College of Sciences and Mathematics together under one roof.

  • ZeroEyes, Academic Innovators Partner to Provide Safety Solutions

    ZeroEyes, which produces a multi-analytics weapons detection and threat intelligence platform, recently announced a partnership with Academic Innovators, according to a news release.