Zurn Elkay Announces Updated Line of Filtered Bottle Filling Stations

Zurn Elkay Water Solutions recently released an updated line of its Elkay Filtered Bottle Filling Stations, according to a news release. The new line features a sleeker design and functional upgrades to help simplify filter maintenance and reduce long-term labor costs. The ezH2O Bottle Fillers, which debuted in 2010, were designed to reduce lead, PFOA/PFOS, and other contaminants.

The units were designed for public spaces like schools, universities, office spaces, gyms, and more. The updated line features the new colors Midnight Black, Arctic White, and Standard Gray. “With the 51600C High-Capacity Replacement Filter, the filter life is doubled to 6,000 gallons and is certified to NSF/ANSI 42, 53 and 401 for the reduction of lead, microplastics, cysts, Class 1 particulate and chlorine taste and odor. Elkay’s WaterSentry 71300C is also rated for the reduction of PFOA/PFOS, two prevalent PFAS chemicals, commonly known as ‘forever chemicals’ for the highest-performing filtration option,” according to the news release.

Other features include a drop-down wrapper, LED filter status display, and an automatic filter light reset. Clients can track data like the number of bottles saved, water usage, and filter status, as well as schedule flushing events to keep plumbing lines clean.

More information is available on the Zurn Elkay website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Homewood-Flossmoor High School NetZero Addition

    Homewood-Flossmoor High School NetZero Addition

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Homewood-Flossmoor High School NetZero Addition has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • Secret to Efficient, On-Time School Infrastructure & Modernization Projects is All in the Preparation

    Warmer weather and longer days make summer the ideal time for construction and modernization projects at educational facilities. School boards and construction firms must coordinate effectively to ensure that these projects do not extend even a single day into the school year and impede classroom operation.

  • Cal Poly Humboldt Starts Construction on Healthcare Education Hub

    California State Polytechnic University, Humboldt in Arcata, Calif., recently announced that work has begun on a renovation project that will turn the Stewart Building into a new Healthcare Education Hub, according to a news release. The university is partnering with Sundt Construction Inc. for construction services.

  • University of Pittsburgh to Build New Residence Hall

    The Board of Trustees from the University of Pittsburgh in Pittsburgh, Penn., recently approved the construction of a new residence hall for first-year students, according to university news.