California High School Debuts $35M Performing Arts Center

Irvine High School in Irvine, Calif., recently opened its new Performing Arts Center built in partnership with C.W. Driver Companies, according to a news release. The facility cost $35 million and covers about 25,000 square feet. Construction began in January 2023, and the grand opening celebration took place on Feb. 7, 2025.

Amenities include a 650-seat main theater with upgraded sound, lighting, and rigging capabilities; a black box theater; dressing rooms; a scene shop; and central lobby, the news release reports.

“We have envisioned this facility for years, and it’s truly exciting to see it come to life,” said Kelvin Okino, Irvine Unified School District’s Executive Director of Facilities and Construction. “Through the voter’s passage of Bond Measure E, we were able to construct a new state-of-the art Performing Arts Center. The success of the project is a testament to the incredible collaboration and partnership we’ve had with C.W. Driver Companies throughout this process. Together, we’ve created a space that will empower creativity and serve our community for generations to come.”

Materials used include a steel and metal frame diaphragm building and a combination of metal panels, plaster, and curtain walls, according to the news release. The construction process incorporated sustainability techniques like irrigation, deep soil mixing, and landscape planning. The facility will play home to a wide range of student performances, rehearsals, and school events.

“We are honored to have worked on such a world-class performing arts center, which will serve as a beacon of creativity and collaboration for students throughout the district and the Irvine greater community,” said C.W. Driver Companies Project Manager Ashcon Hekmat.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • UCNJ Launches $30M Modernization of Physical Education Center

    The Union College of Union County (UCNJ) in Cranford, N.J., recently broke ground on a new $30-million modernization project for its Physical Education Center (PECK), according to a news release. The college partnered with DIGroup Architecture for the project’s design, transitioning the existing 42,000-square-foot structure into a campus hub for student athletics and campus life.

  • Los Angeles City College Breaks Ground on New Administration, Workforce Building

    Los Angeles City College (LACC) in Los Angeles, Calif., recently broke ground on a new $72-million administrative facility, according to a news release. The Cesar Chavez Administration and Workforce Building will stand four stories, cover 67,230 square feet, and play home to a wide variety of the school’s educational and administrative services.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

Digital Edition