MiraCosta College Completes $42.5M Chemistry, Biotechnology Building

MiraCosta College in Oceanside, Calif., recently finished construction on a new, $42.5-million Chemistry and Biotechnology Building, according to a news release. The university partnered with builder C.W. Driver Companies and HED Architects on the 20,630-square-foot facility, which will serve the school’s expanding STEM programs.

The new facility includes shaded outdoor gathering spaces that connect to the larger STEM quad, as well as covered porches and screened study spaces to encourage outdoor collaboration. The interior uses high-efficiency fixtures, eco-friendly materials, and sustainable finishes that integrate with the surrounding campus. The building was designed to meet LEED Silver certification standards, according to the news release.

“This is a significant milestone for MiraCosta College as we officially open the doors to the new Chemistry and Biotechnology Building,” said MiraCosta College Project Manager Joe Webber. “The world is facing challenges that will require innovative solutions, and STEM education will play a vital role in shaping the future. This facility provides our students and faculty with the tools, technology, and resources they need to explore, innovate, and make meaningful contributions to these fields.”

Amenities include modern instructional and lab spaces designed to meet industry needs and provide students with practical skills.

“We are proud to have collaborated with MiraCosta College on delivering this transformative facility,” said Andy Feth, C.W. Driver project executive. “Designed with sustainability, innovation, and student success in mind, this building represents our ongoing commitment to creating high-quality, future-ready educational spaces.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Delta State University Completes Renovations to School of Nursing Facilities

    Delta State University recently completed a major expansion and renovation project for the Robert E. Smith School of Nursing facilities on its campus in Cleveland, Miss., according to a news release. The project includes about 14,000 square feet of new construction and more than 21,000 square feet of renovation work to the existing space.

  • Gretna East High School

    Gretna East High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Gretna East High School has been recognized with an EDS 2025 Project of Distinction award in the category of New Construction.

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • Tufts University Breaks Ground on Two New Residence Halls

    Tufts University in Medford, Mass., recently broke ground on two new residence halls with a total capacity of 664 beds, according to local news. The project’s ultimate goal is to expand on-campus housing and reduce pressure on the local housing market.

Digital Edition