Tennant Company Launches Autonomous Floor Scrubber

Cleaning equipment and solutions provider Tennant Company recently launched the new X6 ROVR, a mid-sized robotic scrubber designed for large commercial and light-industrial environments, according to a news release. The autonomous machine can clean up to 75,000 square feet peer cycle with minimal needs for manual assistance. The product also comes with the optional Tennant XC1 docking station, which charges the scrubber between cleaning cycles.

“As organizations continue to face staffing shortages, automating routine cleaning tasks provides a clear and proven path to operational efficiencies,” said Tennant Company President and CEO Dave Huml. “We built the X6 ROVR to tackle this challenge — delivering dependable, autonomous performance across large-scale and complex environments, so cleaning teams can stay focused on higher-impact work.”

The X6 ROVR runs on the AI-driven BrainOS platform to navigate real-world environments. Key features include an extended cleaning range with a 26-inch, dual-disc scrub path and 25-gallon solution and recovery tanks. Lithium ion batteries provide a six-hour, continuous runtime. The mid-sized design and 3D LiDAR allow for efficient operation in open spaces and crowded areas, offering real-time adaptive routing and obstacle detection. Finally, the BrainOS-powered autonomous operation provides intelligent navigation, remote deployment, and performance-tracking management tools, the news release reports.

“Our customers in small retail, education, and healthcare sectors have seen measurable results with the ROVR platform. Now we are bringing that technology to small industrial and large commercial facilities with the X6 ROVR,” said Seth Rourke, Tennant Company’s Vice President of Global Product Management. “The product truly stands out for its unique ability to deliver high-capacity, high-performance cleaning while remaining incredibly nimble, maneuverable, and compact.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Tennessee State University Gains Approval for New Engineering Facility

    Tennessee State University in Nashville, Tenn., recently announced that it has received approval from the Tennessee State Building Commission to build a new engineering building on campus, according to a university news release. The 70,000-square-foot, $50-million facility will play home to the university’s engineering programs and the Applied & Industrial Technology program.

  • illustration of a school building under construction

    One District, One Way: Bringing Consistency to K–12 Construction Projects

    From budgeting to closeout, here's how a single playbook can turn chaos into clarity in school construction programs.

  • sapling sprouting from a cracked stone

    Lessons in Resilience: Disaster Recovery in Our Schools

    Facility managers play a pivotal role in how well a school weathers and recovers from a crisis. Whether it's a hurricane, a flood, a tornado, or a man-made event, preparation determines resilience.

  • FAU Starts Construction on Holocaust and Jewish Studies Building

    Florida Atlantic University recently began construction on a new academic building for its campus in Boca Raton, Fla., according to university news. The Kurt and Marilyn Wallach Holocaust and Jewish Studies Building will stand two stories, measure in at 22,000 square feet, and play home to the university’s Holocaust education and Jewish studies programs.

Digital Edition