California District Starts Construction on New Robotics Facility

The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration. The district partnered with Quattrocchi Kwok Architects (QKA) for the project’s design and Landmark Construction for construction, with Blach Construction as construction manager.

The new building will replace portable buildings and makeshift classrooms around the district, providing amenities like field space; spectator seating; and workshop, classroom, and teamwork areas, the news release reports. In terms of designing to the space’s function, extra consideration was given to the building’s mechanical and electrical infrastructure, technology, controlled daylighting, acoustic roof deck, wall panels, and security systems.

“We are thrilled to create a dedicated space for our award-winning Robotics Teams, who consistently demonstrate exceptional creativity and skill,” said FUHSD Superintendent Graham Clark. “This new facility will ignite our Robotics Programs, fostering greater collaboration and further innovation. We want to thank the community and our project team for supporting this vision.”

Other design aspects include high ceilings for work and experimentation with aerial drones, as well as Electrostatic Discharge (ESD)-protected floors to prevent the buildup of static electricity between electronics and robots. The facility’s Wi-Fi infrastructure was also set up to avoid interference with robotic control systems, according to the news release. Exterior features include rooftop solar panels, an entry plaza, and outdoor workspaces.

“Designing a facility with such unique requirements presented its own challenges, but the collaboration with current and recent students, adult mentors and coaches was invaluable to our design process,” said QKA Principal Nick Stephenson. “Their firsthand insights directly shaped the project’s outcome, helping us create a facility that will greatly benefit and enhance their program.”

The building is scheduled to open to students at the beginning of the fall 2026 semester, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • University of Kentucky Sees Positive Results from Energy Efficiency Program

    The University of Kentucky in Lexington, Ky., recently announced the results of its Energy Program in Facilities Management, put into place eight years ago, according to a news release. Between the fiscal years of 2017 and 2025, the university’s campus grew by 13.6% while the energy use per square foot dropped by 19.2%.

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • Inglewood Unified School District Breaks Ground on New High School

    The Inglewood Unified School District in Inglewood, Calif., recently broke ground on a new campus for Inglewood High School, according to a news release. The project has a budget of about $240 million, funding coming through bond proceeds from Measure I.

  • California School District Starts Construction on Public Safety Center

    The San Bernardino City Unified School District (SBCUSD) recently announced that construction has begun on a new public safety center that will house the district’s safety and security programs. According to a news release, the James Ramos Center for Public Safety will measure in at 17,140 square feet and contain the district’s Police Department, Office of Emergency Management, and cadet program.

Digital Edition