California District Starts Construction on New Robotics Facility

The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration. The district partnered with Quattrocchi Kwok Architects (QKA) for the project’s design and Landmark Construction for construction, with Blach Construction as construction manager.

The new building will replace portable buildings and makeshift classrooms around the district, providing amenities like field space; spectator seating; and workshop, classroom, and teamwork areas, the news release reports. In terms of designing to the space’s function, extra consideration was given to the building’s mechanical and electrical infrastructure, technology, controlled daylighting, acoustic roof deck, wall panels, and security systems.

“We are thrilled to create a dedicated space for our award-winning Robotics Teams, who consistently demonstrate exceptional creativity and skill,” said FUHSD Superintendent Graham Clark. “This new facility will ignite our Robotics Programs, fostering greater collaboration and further innovation. We want to thank the community and our project team for supporting this vision.”

Other design aspects include high ceilings for work and experimentation with aerial drones, as well as Electrostatic Discharge (ESD)-protected floors to prevent the buildup of static electricity between electronics and robots. The facility’s Wi-Fi infrastructure was also set up to avoid interference with robotic control systems, according to the news release. Exterior features include rooftop solar panels, an entry plaza, and outdoor workspaces.

“Designing a facility with such unique requirements presented its own challenges, but the collaboration with current and recent students, adult mentors and coaches was invaluable to our design process,” said QKA Principal Nick Stephenson. “Their firsthand insights directly shaped the project’s outcome, helping us create a facility that will greatly benefit and enhance their program.”

The building is scheduled to open to students at the beginning of the fall 2026 semester, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Colorado State University Global, SCTE Launch Online Certificate Program

    Colorado State University Global (CSU Global), based in Denver, Colo., recently announced a partnership with CableLabs subsidiary the Society of Cable Telecommunications Engineers (SCTE) to launch an online certificate training program for broadband professionals, according to a news release.

  • School Construction Projects Boom as Education Systems Address Aging Facilities and Growth

    Construction opportunities are almost always abundant, but currently there are more than usual construction projects being launched for public school campuses. Common objectives include major renovation or expansion of aging facilities, total replacement of inefficient classrooms, upgrades to lighting, technology, and security equipment, and adding new sports and cultural facilities.

  • Designing Learning Spaces that Support Student Mental Health and Wellness

    In today’s education landscape, schools are more than just centers for learning; they are integral to the holistic development and well-being of students. The global pandemic underscored the importance of addressing mental health in schools, as productivity dropped, stress levels rose and students faced challenges managing emotions.

  • Texas K–12 District to Build New Elementary, High Schools

    The High Island Independent School District on the Bolivar Peninsula in Southeast Texas recently announced that construction on a new elementary school and a new high school will begin in January 2026, according to local news. Funding will come from a $27.9-million bond passed in May 2025.

Digital Edition