California Middle School Completes Two New Academic Buildings

Sunnyvale Middle School in Sunnyvale, Calif., recently announced that construction is complete on two new classroom buildings of two stories each, according to a district news release. The new wing will house seventh- and eighth-grade students and is part of a larger campus modernization project. Quattrocchi Kwok Architects (QKA) and LPA, Inc., provided design services, while Blach Construction handled the build.

The two buildings add a total of 35,000 square feet, 23 adaptable classrooms, an art classroom, five student breakout spaces, a teacher collaboration area, and a 23,000-square-foot outdoor courtyard.

“I am grateful to our community for supporting our bond measures and making it possible to upgrade our school facilities. These improvements will directly enhance the learning experience for our students,” said Sunnyvale School District Superintendent Gudiel R. Crosthwaite. “I also want to thank our outstanding project team for staying on track with such an ambitious timeline. This allows us to make a meaningful difference for as many students as possible, as quickly as possible.”

The new wing is on track toward receiving a Collaborative for High Performance Schools (CHPS)-Designed certification. Design elements emphasizing sustainability include bioretention basins to capture and filter stormwater as well as solar panels as a source of renewable energy.

“Collaboration was key to bringing the stakeholders and design teams together to meet programmatic goals to deliver a project ready for students to start the school year,” said LPA, Inc., senior project manager Denise Flatley. “Locating the buildings to create a courtyard that connects to Spartan Square, leaving space for the future growth of the campus by utilizing two-story buildings, and emphasizing the need for interior and exterior learning space for the social and emotional growth of the students were our top priorities. The result is a student centric space we are excited to see students use daily.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.

Digital Edition