Texas District Finishes Construction on New Middle School, Admin Building

The Westwood Independent School District recently held a ribbon-cutting ceremony for the new Westwood Middle School and Administration Building in Palestine, Texas, according to a news release. The campus covers 106,000 square feet and has the capacity for 650 students in grades 6–8, and it will also play home to the district’s staff and administration.

The July 31 ceremony included an open house and guided tours before the start of school on Aug. 13. Funding for the middle school came from Bond 2021, a $38-million bond referendum that went toward new facilities, renovations, and repairs and upgrades around the district. Funding for the administration building came through local resources and wasn’t included in the bond package, according to the news release.

“These new facilities are a testament to the vision of our community and the commitment to creating learning environments where our students can thrive,” said WISD Superintendent Wade Stanford. “We’re already seeing a positive impact on student engagement and staff collaboration.”

The district partnered with Fitzpatrick Architects and Pfluger Architects for the project’s design, as well as Jackson Construction for construction services. The project consisted of renovating four existing buildings into a single facility. The campus consists of new and refurbished buildings that took advantage of existing structures, foundations, and loadbearing walls.

“The design intent is to support the learning space profile defined by input from the community, parents, staff, and students,” said Pfluger CEO Terry Hoyle. “The learning spaces include flexible and comfortable instructional spaces; collaborative spaces for engagement, creativity, and student choice; and non-academic spaces for community engagement and outdoor learning.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Photo credit - Chuck Coates

    Florida District Modernizes Central Energy Plants at Two High Schools

    Flagler Schools, a public school district in Flagler County, Fla., recently partnered with Matern Professional Engineering to modernize the central energy plants at two of its high schools, according to a news release. The project is part of a larger, district-wide effort to reduce energy costs and operational expenses.

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.