Tennessee State University Gains Approval for New Engineering Facility

Tennessee State University in Nashville, Tenn., recently announced that it has received approval from the Tennessee State Building Commission to build a new engineering building on campus, according to a university news release. The 70,000-square-foot, $50-million facility will play home to the university’s engineering programs and the Applied & Industrial Technology program, providing a consolidated complex for innovation, research, and collaboration. Construction will begin later this year and has an estimated completion date of summer 2027.

“Over the years, our college has experienced significant growth in students, faculty, research, and academic programs,” said Dr. Lin Li, Dean of the College of Engineering. “This facility will provide a world-class space that enhances interdisciplinary collaboration across six undergraduate programs, three master’s programs, and one Ph.D. program. It will also host innovative engineering activities that directly benefit the metro Nashville area and Middle Tennessee.”

The facility features classrooms; computer labs; and a combined total of 30 teaching and research labs, including a Future Energy Lab, Drone Flight and Air Traffic Lab, and an Additive Manufacturing Lab, the news release reports. The university partnered with Melvin Gill & Associates and Bauer Askew Architecture for the project’s design.

“The new engineering building is the first step in elevating Tennessee State University’s engineering program to meet the demands of industry and the state of Tennessee,” said Will Radford, the university’s assistant vice president of Planning, Design, and Construction. “By establishing new partnerships and providing modern facilities, we are positioning TSU engineering students to not only keep pace but to set standards in the industry.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • A university

    Breaking Higher Education's Billion-Dollar Backlog Problem

    Strategic mechanical system design can transform campus maintenance backlogs. Here's how.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

  • Colorado State University Global, SCTE Launch Online Certificate Program

    Colorado State University Global (CSU Global), based in Denver, Colo., recently announced a partnership with CableLabs subsidiary the Society of Cable Telecommunications Engineers (SCTE) to launch an online certificate training program for broadband professionals, according to a news release.

Digital Edition