Lewis C. Cassidy Elementary School

Grand Prize, New Construction | 2025 Education Design Showcase

EwingCole

Project Information

Facility Use: K-12 Institution
Project Type: New Construction
Category: Whole Building / Campus Design
Location: Pennsylvania
District/Inst.: School District of Philadelphia
Chief Administrator: Herman Douglas
Completion Date: 8/16/2024
Gross Area: 83,000 square feet
Area Per Student: n/a
Site Size: 1.9 acres
Current Enrollment: 232
Capacity: 570
Cost per Student: n/a
Cost per Sq. Ft.: $665
Total Cost: $55,200,000

Designed to set a new standard for education in Philadelphia, Lewis C. Cassidy Elementary School is a dynamic, LEED Gold-designed K-8 facility that supports 21st-century learning while fostering deep community connections. The 83,000-square-foot school serves 570 students and replaces an outdated early 20th-century building with a flexible, technology-integrated environment tailored for modern pedagogy.

The design overcomes the previous school's spatial and technological limitations by incorporating collaborative learning spaces, a central student common ("the canyon"), and a state-of-the-art media center. The layout maximizes daylight, improves circulation, and supports diverse learning styles with specialized STEAM-focused classrooms, maker spaces, and a discovery common. Biophilic design and intuitive color-coded wayfinding buttresses the welcoming, inspiring environment.

The design prioritizes safety and security through thoughtful planning. Open sightlines throughout the building and grounds enhance natural surveillance and mitigate risk. Spaces encourage positive social interaction, reducing behaviors such as bullying. Controlled entry points and secure pathways protect students while maintaining accessibility for community use.

Outdoor areas extend learning beyond the classroom, with a biophilic playground, a green roof, and stormwater gardens that enhance sustainability and student wellness. Community engagement is central to the design, ensuring the school's assembly spaces, gymnasium, and outdoor areas serve as neighborhood assets.

By prioritizing inclusivity, sustainability, and innovation, Cassidy Elementary establishes itself as a "school of choice," shaping the future of education in Philadelphia while enriching the surrounding community.

Architect(s):

EwingCole
215-923-2020

Featured

  • University of Kentucky Sees Positive Results from Energy Efficiency Program

    The University of Kentucky in Lexington, Ky., recently announced the results of its Energy Program in Facilities Management, put into place eight years ago, according to a news release. Between the fiscal years of 2017 and 2025, the university’s campus grew by 13.6% while the energy use per square foot dropped by 19.2%.

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • Inglewood Unified School District Breaks Ground on New High School

    The Inglewood Unified School District in Inglewood, Calif., recently broke ground on a new campus for Inglewood High School, according to a news release. The project has a budget of about $240 million, funding coming through bond proceeds from Measure I.

  • California School District Starts Construction on Public Safety Center

    The San Bernardino City Unified School District (SBCUSD) recently announced that construction has begun on a new public safety center that will house the district’s safety and security programs. According to a news release, the James Ramos Center for Public Safety will measure in at 17,140 square feet and contain the district’s Police Department, Office of Emergency Management, and cadet program.

Digital Edition