Lewis C. Cassidy Elementary School

Grand Prize, New Construction | 2025 Education Design Showcase

EwingCole

Project Information

Facility Use: K-12 Institution
Project Type: New Construction
Category: Whole Building / Campus Design
Location: Pennsylvania
District/Inst.: School District of Philadelphia
Chief Administrator: Herman Douglas
Completion Date: 8/16/2024
Gross Area: 83,000 square feet
Area Per Student: n/a
Site Size: 1.9 acres
Current Enrollment: 232
Capacity: 570
Cost per Student: n/a
Cost per Sq. Ft.: $665
Total Cost: $55,200,000

Designed to set a new standard for education in Philadelphia, Lewis C. Cassidy Elementary School is a dynamic, LEED Gold-designed K-8 facility that supports 21st-century learning while fostering deep community connections. The 83,000-square-foot school serves 570 students and replaces an outdated early 20th-century building with a flexible, technology-integrated environment tailored for modern pedagogy.

The design overcomes the previous school's spatial and technological limitations by incorporating collaborative learning spaces, a central student common ("the canyon"), and a state-of-the-art media center. The layout maximizes daylight, improves circulation, and supports diverse learning styles with specialized STEAM-focused classrooms, maker spaces, and a discovery common. Biophilic design and intuitive color-coded wayfinding buttresses the welcoming, inspiring environment.

The design prioritizes safety and security through thoughtful planning. Open sightlines throughout the building and grounds enhance natural surveillance and mitigate risk. Spaces encourage positive social interaction, reducing behaviors such as bullying. Controlled entry points and secure pathways protect students while maintaining accessibility for community use.

Outdoor areas extend learning beyond the classroom, with a biophilic playground, a green roof, and stormwater gardens that enhance sustainability and student wellness. Community engagement is central to the design, ensuring the school's assembly spaces, gymnasium, and outdoor areas serve as neighborhood assets.

By prioritizing inclusivity, sustainability, and innovation, Cassidy Elementary establishes itself as a "school of choice," shaping the future of education in Philadelphia while enriching the surrounding community.

Architect(s):

EwingCole
215-923-2020

Featured

  • Uvalde Schools Receive AI Security Technology through Grant Program

    AI-powered gun detection and emergency response technology solutions provider Omnilert recently launched the Save Haven Grant program, according to a news release. The first recipient of the grant, aimed specifically at schools that have faced gun violence, will be the Uvalde Consolidated Independent School District (Uvalde CISD) in Uvalde, Texas.

  • Extron, CENTEGIX Partner for Comprehensive School Security Solution

    Professional audiovisual solutions provider Extron recently announced a partnership with CENTEGIX, which provides rapid incident response technology, to integrate two of their top products in the name of school safety.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • S4L Launches 2025 Facilities and Construction Brief Survey

    Spaces4Learning recently launched its 2025 Facilities and Construction Brief Survey, which gathers information on K–12 and higher education construction projects nationwide from the previous year. The data we get from you, our readers, forms an industry report offering an overview of current trends in school facilities.

Digital Edition