DFW-Area District Opens New Replacement Middle School

The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023. The district partnered with VLK for the project’s design.

The school’s design was inspired by the prototype of nearby Marine Creek Middle School, paying tribute to the school’s history and sense of school pride while upgrading important amenities. The new facility expands the campus by 30,000 square feet to a total of 180,000 square feet, allowing a total capacity of 1,200 students. The building contains three academic wings connecting to a central media center, according to the news release.

“Through the support of the bond program and the dedicated work of district leadership, board, and staff, this vision has become a reality. The new Wayside Middle School is more than a building. It is a modern learning environment designed to support academic excellence, student engagement, and long-term success,” said Lauren Brown, VLK Principal. “This is a moment to celebrate what thoughtful planning and community trust can accomplish. Congratulations to EMS ISD on delivering a campus that will serve generations of students for years to come.”

According to the news release, construction occurred in two phases to minimize disruptions for students during the transition phase. Phase I consisted of the facility itself, which opened its doors to students at the beginning of the spring 2026 semester. Phase II will consist of developing school parking and athletics facilities, and is currently underway.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • 144-Year-Old High-School Campus Debuts New Academic Facility

    San Diego High School (SDHS) in San Diego, Calif., recently held a ribbon-cutting ceremony for a new student services and classroom building; the project is part of a larger SDHS Whole Site Modernization project that began in 2022.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • Spaces4Learning Trends & Predictions for Educational Facilities in 2026: Part II

    As education leaders look toward 2026, the design of K–12 and higher education facilities is being reshaped by powerful, converging forces. Survey respondents point to the rapid growth of Career and Technical Education, deeper alignment with workforce and industry needs, and the accelerating influence of AI and emerging technologies.