Construct and Maintain

According to our 18th Annual College Construction Report, just $9.7B worth of college construction was completed in 2012, a drop from previous year investments. The majority of dollars spent were for the construction of new buildings. But building new is only part of the equation; taking care of the buildings we already have in place is the other.

With the importance of higher education on the rise and enrollment continuing to climb, we will continue to need new and upgraded spaces. We will also need to set aside dollars to maintain the new facilities that we build, otherwise our investments will be squandered. Then there are all of those “other” buildings… the ones originally built in the 1920s, added on to in the ’50s, ’70s, ’90s, and so on. The truth is that a majority of our educational facilities in this country are approaching the half-century mark and are in major need of maintenance and repair!

In a 1988 report, “The Decaying American Campus: A Ticking Time Bomb,” prepared by the accounting firm of Coopers & Lybrand and sponsored by the Association of Physical Plant Administrators of Universities and Colleges and by the National Association of College and University Business Officers, we were told that by constantly deferring expenses for maintenance, colleges and universities faced an estimated $20B in urgently needed work to repair and update buildings, equipment, and utilities. The total potential need could cost up to $70B. The report also found that, despite urgent repair needs, colleges and universities deferred $4 for every $1 spent on maintenance in their 1988 budgets.

The 2010 APPA Thought Leaders Series states that higher education institutions own some of the most valuable real estate in the world with some of the most significant architecture, specialized research facilities, and beloved sports complexes. Yet while campuses and facilities were identified as strength, they were also perceived as a weakness. Aging buildings combined with rising materials and energy costs can make the physical campus a drag on the institutional budget.

Not performing routine maintenance can cost us many times over; increasing costs, wasting taxpayer dollars, and disrupting our students’ education. It’s not hard to get people excited about a new and shiny building. However, it’s time we get excited about our ability to maintain the buildings we have — giving them new life, making them better and safer places to learn. 

Featured

  • Wisconsin District Breaks Ground on New Elementary School

    The School District of La Crosse in La Crosse, Wis., recently broke ground on a new elementary school that will consolidate the students and staff of two existing schools, according to local news. Funding for the school comes from a $53-million referendum approved in 2024.

  • Massachusetts K–12 District Selects Architect for New Junior High

    Swansea Public Schools in Swansea, Mass., recently announced that it has selected Finegold Alexander Architects to design a new junior high school for the district, according to a news release. The firm will create the Feasibility Study and Schematic Design for Joseph Case Junior High School after a lengthy selection process by the Massachusetts School Building Authority (MSBA).

  • blurry image capturing students navigating crowded hallways between classes

    How Human Behavior Data Is Reshaping Campus Facilities Management

    The ebb and flow of students, faculty, and administrators across a campus have a larger impact on maintenance, cleaning, and sustainability than many realize.

  • Spaces4Learning Launches 2026 Education Design Showcase Awards

    Spaces4Learning has opened submissions for the 2026 Education Design Showcase! The awards program launched in 1999 with the goal of celebrating innovative, practical solutions in the planning, design, and construction of K–12 and higher-education facilities. EDS recognizes new developments that help achieve optimal learning environments, as well as the architecture firms that brought the ideas to life.