Construction Report Part of a Bigger Story

This month we are releasing the results of our 18th Annual School Construction Report. Over $12.9 billion worth of school construction was completed in 2012, with districts planning to start another $10.5 billion in 2013. In the past, the focus was on new school construction. This year you will see that nearly half of all monies spent are going toward additions and renovation projects. With cutbacks in spending and gridlock in Washington, schools, like everyone else, are focusing on making what they have work!
 
With the population growing and education delivery changing, we will continue to need new and upgraded spaces. We will also need to set aside dollars to maintain the new facilities that we build, otherwise our investments will be squandered as equipment fails, warranties are invalidated and our new buildings deteriorate. Then, there are all of those “other” buildings… the ones originally built in the 1920s, added on to in the ’50s, ’70s, ’90s and so on. The truth is that a majority of our schools in this country are approaching the half-century mark and are in major need of maintenance and repair!
 
According to a report prepared by the Council of the Great City Schools, 77 percent of major city school systems need funds for repairs, renovations, modernization and new construction to meet 21st century educational needs. The 50 major city school systems responding to the survey indicated a total facilities’ need of about $76.5 billion or approximately $8.9 million per school — $15.3 billion in new construction needs; $46.7 billion in repair, renovation and modernization needs; $14.4 billion in deferred maintenance needs. On the basis of enrollment and school-building data, the council projects that its 65-member urban school systems need approximately $20.1 billion in new construction, $61.4 billion in repair, renovation and modernization, and $19 billion in deferred maintenance — or some $100.5 billion in total facility needs.
 
A plan for maintenance and repair should be an integral part of every school budget, and must not be the item to be cut when money is tight. Not performing routine maintenance costs districts many times over. It’s not hard to get people excited about a new shiny building. But, it’s time we get excited about our ability to maintain the buildings we have — giving them new life, making them a better and safer place to learn. 

 

Featured

  • Arlington High School

    Arlington High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Arlington High School has been recognized with an EDS 2026 Grand Prize award in the category of New Construction.

  • Campus Safety Requires Using Every Resource Available

    Across the U.S., school and campus leaders are facing a security landscape that has changed dramatically over the past decade. Incidents on school property have increased in recent years, with several consecutive years setting record totals. According to analysis of data by CNN, dozens of shootings now occur on school grounds annually across K-12 and higher education environments.

  • California Middle School Breaks Ground on Major Renovation Project

    The Hillsborough City School District (HCSD) in Hillsborough, Calif., recently began construction on new multipurpose and administration facilities for Crocker Middle School, according to a news release.

  • Spaces4Learning Launches 2026 Facilities and Construction Brief Survey

    Spaces4Learning recently launched the 2026 Facilities and Construction Brief Survey, which collects data on the previous year’s K–12 and higher education construction projects nationwide.