Construction Report Part of a Bigger Story

This month we are releasing the results of our 18th Annual School Construction Report. Over $12.9 billion worth of school construction was completed in 2012, with districts planning to start another $10.5 billion in 2013. In the past, the focus was on new school construction. This year you will see that nearly half of all monies spent are going toward additions and renovation projects. With cutbacks in spending and gridlock in Washington, schools, like everyone else, are focusing on making what they have work!
 
With the population growing and education delivery changing, we will continue to need new and upgraded spaces. We will also need to set aside dollars to maintain the new facilities that we build, otherwise our investments will be squandered as equipment fails, warranties are invalidated and our new buildings deteriorate. Then, there are all of those “other” buildings… the ones originally built in the 1920s, added on to in the ’50s, ’70s, ’90s and so on. The truth is that a majority of our schools in this country are approaching the half-century mark and are in major need of maintenance and repair!
 
According to a report prepared by the Council of the Great City Schools, 77 percent of major city school systems need funds for repairs, renovations, modernization and new construction to meet 21st century educational needs. The 50 major city school systems responding to the survey indicated a total facilities’ need of about $76.5 billion or approximately $8.9 million per school — $15.3 billion in new construction needs; $46.7 billion in repair, renovation and modernization needs; $14.4 billion in deferred maintenance needs. On the basis of enrollment and school-building data, the council projects that its 65-member urban school systems need approximately $20.1 billion in new construction, $61.4 billion in repair, renovation and modernization, and $19 billion in deferred maintenance — or some $100.5 billion in total facility needs.
 
A plan for maintenance and repair should be an integral part of every school budget, and must not be the item to be cut when money is tight. Not performing routine maintenance costs districts many times over. It’s not hard to get people excited about a new shiny building. But, it’s time we get excited about our ability to maintain the buildings we have — giving them new life, making them a better and safer place to learn. 

 

Featured

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.

  • Vanderbilt to Partner with ABM for Campus Preservation and Modernization

    Vanderbilt University recently announced that it has selected ABM Performance Solutions for a preservation and modernization project at its New York City campus, according to a news release. ABM will deliver its end-to-end ABM Performance Solutions (APS) model to manage critical operations during renovation and maintenance.

  • abstract illustration of school gym

    How the Gymnasium Can Serve as a Model for Learning Space Design

    Multipurpose gyms work because flexibility was built into the brief from the start, not retrofitted later. The same logic applies to academic spaces.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.