Messiah College

Calvin and Janet High Center for Worship and Performing Arts

Messiah College 

PHOTOS © NATHAN COX

Messiah College in Mechanicsburg, PA, recently opened the 92,000-square-foot Calvin and Janet High Center for Worship and Performing Arts. The music program had long outgrown their previous facility and desperately needed updated rehearsal and performance space. Completed in January, the High Center has exceeded the expectations of both faculty and students.

The focal point of the building is the 778-seat Parmer Hall, created to host musical concerts, worship services, lectures and other events. The large stage can accommodate a 100-piece orchestra with a choral terrace for 116 singers above. The acoustical design of the room has features that allow an incredible presence and warmth for unamplified musical ensembles along with crisp, clear sound from amplified groups on stage.

Outside of Parmer Hall, music education and rehearsals were the driving force for design. A smaller performance venue located just across the corridor is the High Foundation Recital Hall. This 156-seat room emulates the incredible acoustics of Parmer Hall on a smaller scale. It hosts numerous music recitals, small lectures and academic classes. Nearby, there is an instrumental rehearsal room for large bands and orchestras, a choral rehearsal room for the college’s many vocal ensembles and a chamber rehearsal room for smaller music groups such as brass quintets or string quartets.

Each room was designed for maximum flexibility in order to be easily reconfigured to accommodate the needs of any group. There is also a classroom, a keyboard instruction lab and a fully functional recording studio. Students can practice in one of eighteen private rehearsal rooms.

Twenty faculty offices, which double as private teaching studios, line the perimeter of the building. Student instrument storage is provided in custom-made cabinets kept in closets throughout the facility.

This article originally appeared in the College Planning & Management August 2013 issue of Spaces4Learning.

Featured

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • North Texas School District Completes Third New Elementary School

    The Denton Independent School District in Dallas, Texas, recently finished construction on its third prototype design elementary school, Reeves Elementary, according to a news release.

  • Armstrong World Industries Acquires Geometrik

    Armstrong World Industries, designer and manufacturer of interior and exterior architectural applications like ceilings, walls, and metal solutions, recently announced its acquisition of Canada-based Geometrik, according to a news release. The British Columbian Geometrik specializes in designing and manufacturing wood acoustical and wall systems.

Digital Edition