Never Get Called on the Carpet

Sponsored content by L&M CONSTRUCTION CHEMICALS

At least thousands. Maybe hundreds of thousands. That’s what you’ll save with an FGS/PermaShine polished concrete floor. The explanation is really pretty simple. FGS/PermaShine floors don’t scuff, scratch, peel, chip, mark or any of the other things that mess up any other kind of floor.

Why? Because unlike other floors, FGS/PermaShine floors aren’t just thin coatings or wax. The beauty of PermaShine is built right into the concrete, so it never wears off and it never wears out. That means you’re saving money from day one and your savings will continue to grow for years.

FGS/PermaShine polished concrete floors don’t really need a lot of care. Sweep them, wash them, use them. That’s it. Really. Nothing to replace, no stripping and no high maintenance costs. Ever.

This just might be the best part. The FGS/PermaShine system works just as well on an old floor as it does a new one. We’ve restored floors that were over 100 years old. Compare FGS/PermaShine restoration to replacement costs and you’re in for a very nice surprise.

FGS/PermaShine floors are GreenSpec certified and contribute to LEED points for their sustainability and environmental advantages. (Ask about our FREE Guide to Polished Concrete and LEED.)

FGS/PermaShine floors aren’t slippery, despite their shiny appearance. In fact, The National Floor Safety Institute (NFSI) certified FGS/PermaShine as “High Traction” floors.

Take the next step to a beautiful concrete floor. Call us for a FREE Concrete Color Guide and the full report on all the advantages of FGS/PermaShine.

This article originally appeared in the issue of .

Featured

  • Esports are Growing in Popularity

    Video games and esports are a popular social hobby, and it’s one that’s accessible to a wide variety of physical ability levels. Some esport student-athletes have started to earn scholarship opportunities, and high schools are beginning to form teams equipped with the same degree of resources as their physical sports teams. However, the two have very different needs.

  • Missouri Child Development Center Completes $2.3M Expansion

    The Urban Sprouts Child Development Center in St. Louis, Mo., recently announced the completion of a $2.3-million expansion and adaptive reuse project, according to a news release. The new space includes a retail café, outdoor learning space, and a support office building.

  • Montclair State University Debuts New VR Facility

    Montclair State University in Montclair, N.J., recently announced the completion of a new virtual reality learning facility developed in partnership with Dreamscape Learn, according to a news release. The 2,450-square-foot lab space is inside the College of Communication and Media building and will serve students pursuing careers in digital media, virtual reality, and content creation.

  • Houston-Area High School Receives Best Project Award from ENR

    Tomball West High School near Houston, Texas, recently received a K–12 Education Best Project Award in Engineering News-Record’s 2026 Texas & Southeast Best Projects Awards, according to a press release. The new facility was completed in May and opened its doors to students for the fall 2026 semester.