Never Get Called on the Carpet

Sponsored content by L&M CONSTRUCTION CHEMICALS

At least thousands. Maybe hundreds of thousands. That’s what you’ll save with an FGS/PermaShine polished concrete floor. The explanation is really pretty simple. FGS/PermaShine floors don’t scuff, scratch, peel, chip, mark or any of the other things that mess up any other kind of floor.

Why? Because unlike other floors, FGS/PermaShine floors aren’t just thin coatings or wax. The beauty of PermaShine is built right into the concrete, so it never wears off and it never wears out. That means you’re saving money from day one and your savings will continue to grow for years.

FGS/PermaShine polished concrete floors don’t really need a lot of care. Sweep them, wash them, use them. That’s it. Really. Nothing to replace, no stripping and no high maintenance costs. Ever.

This just might be the best part. The FGS/PermaShine system works just as well on an old floor as it does a new one. We’ve restored floors that were over 100 years old. Compare FGS/PermaShine restoration to replacement costs and you’re in for a very nice surprise.

FGS/PermaShine floors are GreenSpec certified and contribute to LEED points for their sustainability and environmental advantages. (Ask about our FREE Guide to Polished Concrete and LEED.)

FGS/PermaShine floors aren’t slippery, despite their shiny appearance. In fact, The National Floor Safety Institute (NFSI) certified FGS/PermaShine as “High Traction” floors.

Take the next step to a beautiful concrete floor. Call us for a FREE Concrete Color Guide and the full report on all the advantages of FGS/PermaShine.

This article originally appeared in the issue of .

Featured

  • Nashville Elementary School Receives LEED Gold Certification

    Goodlettsville Elementary School, part of Metro Nashville Public Schools in Nashville, Tenn., recently achieved LEED Gold Certification from the U.S. Green Building Council (USGBC), according to a news release. The 81,750-square-foot school opened in 2023 and was designed by Goodwyn Mills Cawood (GMC).

  • Phoenix High School Completes First Phase of Campus Renovations

    Metro Tech High School, part of the Phoenix Union High School District (PXU) in Phoenix, Ariz., recently announced the completion of the first stage of a campus renovation project, according to a news release. The school reopened a series of public-facing business operations spaces including credit union, daycare, floral, cosmetology, and culinary services. It also includes new CTE learning spaces for the school’s nursing assistant, pharmacy, and sports medicine programs.

  • TCU Marks Campus Expansion Milestone

    Texas Christian University in Fort Worth, Texas, recently held a topping-out ceremony to mark progress on a major campus expansion effort including four new residential facilities and a five-story parking garage, according to a news release.