University of Tulsa: Lorton Performance Center

University of Tulsa

PHOTOS © HASTINGS+CHIVETTA ARCHITECTS, INC. / FENTRESS PHOTOGRAPHY

Hastings+Chivetta's Master Plan and study of the University of Tulsa’s current theatre building indicated that a new building was needed to provide additional space, improved functionality and state-of-the-art technology. The firm’s design for the resulting $28-million Performance Center contains 91,937 square feet of new construction and is sited at the edge of the Oklahoma campus for easy access by the public.

The major component of the Roxana Rozsa and Robert Eugene Lorton Performance Center is a 700-seat grand concert hall with a full 2,100-square-foot performance stage. The stage has a trap and large wings, as well as an orchestra pit, control booth and catwalks. A stretched fabric ceiling system with incorporated lighting gives the theater a unique finish. Support spaces include a green room, dressing rooms, scene shop, costume shop with laundry and storage, props room, lighting equipment and piano storage.

The lobby has a box office, coat check and art gallery. Other amenities include a catering kitchen with pantry, vending area and custodial storage.

A recital hall and various-sized rehearsal spaces are included for instrumental and vocal music, including a piano lab, percussion teaching studio and practice rooms, jazz band, music library, choral recording room and music technology computer lab. A film studio has production, scoring and editing capabilities.

Outside, a dramatic colonnade, featuring distinctive two-story Gothic arches, overlooks a sweeping front lawn.

The facility is the new home to the School of Music and the Film Studies Department, with each having their own office suite, classrooms and storage.

A student lounge and offices for student drama and music chapters are also included.

This article originally appeared in the issue of .

Featured

  • South Carolina District Starts Construction on $50M Middle School Renovation

    The Aiken County Public School District in North Augusta, S.C., recently held a groundbreaking ceremony for the $50-million renovation and expansion of North Augusta Middle School, according to a news release. The project’s funding comes from the 2024 renewal of a one-cent sales tax approved by local voters.

  • Academy of Classical Education Breaks Ground in Louisiana

    Charter Schools USA (CSUSA) recently announced the groundbreaking of a new public charter school in Covington, La., according to a news release. The Academy of Classical Education at Covington will enroll students in grades K–8 and is scheduled for completion in August 2026, just in time for the new school year.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Kimball International Releases Curated Design Support Program

    Commercial furnishings company Kimball International recently announced the launch of a new end-to-end design support program, DesignSuite. According to a news release, its goal is to guide architecture & design professionals and dealer partners through the process from vision to specification.